Related papers: A gap clearing kicker for Main Injector
Compensation of multi-bunch beam loading is of great importance in the main linac of the Compact Linear Collider (CLIC). The bunch-to-bunch energy variation has to stay below 1 part in 1000. In CLIC, the RF power is obtained by decelerating…
A capability to provide a large variety of bunch patterns is crucial for the concept of the Project X serving MW-range beam to several experiments simultaneously. This capability will be realized by the Medium Energy Beam Transport's (MEBT)…
The UNILAC was improved for high current performance by replacing the Wideroe prestripper accelerator by an RFQ and an IH-type DTL. In addition, one of two ion source terminals was equipped with high current sources of MUCIS- and…
For NOvA and future experiments requiring high intensity proton beams, Fermilab is in the process of upgrading the existing accelerator complex for increased proton production. One such improvement is to reduce the Main Injector cycle time,…
In the upgrade project of Hefei Light Source (HLS II), a new digital longitudinal bunch-by-bunch feedback system will be developed to suppress the coupled bunch instabilities in the storage ring effectively. We design a new waveguide…
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under…
The ILC beam dumps are a key part of the accelerator design. At Snowmass 2005, the current status of the beam dump designs were reviewed, and the options for the overall dump layout considered. This paper describes the available dump…
Beam stoppers are installed in the transfer lines of the CERN accelerator complex; these components are used as part of the access safety system, which guarantees the safety of workers in the accelerators. They are designed to stop one or…
The timing system of SPring-8 booster synchrotron generates various timing signals concerning beam injection, acceleration from 1 GeV to 8 GeV and ejection. We have improved the timing system of the synchrotron giving it better stability…
We have measured the total energy spread (99 persent energy spread) of the Booster beam at its injection energy of 400 MeV by three different methods - 1) creating a notch of about 40 nsec wide in the beam immediately after multiple turn…
Following the PIP-II 800 MeV Linac, Fermilab will need an accelerator that extends from that linac to the MI injection energy of ~8 GeV, completing the modernization of the Fermilab high-intensity accelerator complex. This will maximize the…
Fermilab is planning the construction of a prototype front end of the Project X linac. The Project X Injector Experiment (PXIE) is expected to accelerate 1 mA cw H- beam up to 30 MeV. Some of the major goals of the project are to test a cw…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab began operations in late 2004. NuMI will deliver an intense muon neutrino beam of variable energy (2-20 GeV). Several aspects of the design and results from runs of the MINOS…
We describe the installation, commissioning, and characterization of the new injection kicker system in the Muon $g-2$ Experiment (E989) at Fermilab, which makes a precision measurement of the muon magnetic anomaly. Three Blumlein pulsers…
Beam stacking allows a Fixed Field alternating gradient Accelerator (FFA) to increase the extracted beam current whilst also allowing for a flexible time structure making FFAs a promising candidate for future spallation neutron sources and…
In Fermilab's neutrino facilities such as the Neutrinos at the Main Injector (NuMI) and the upcoming Long Baseline Neutrino Facility (LBNF), a proton beam strikes high-power target, producing positively and negatively charged pions and…
The Fermilab Linac is a roughly 145 meter linear accelerator that accelerates H- beam from 750 keV to 400 MeV and provides beam for the Booster and the rest of the accelerator chain. The first section of the Linac is a Drift-Tube Linac…
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton…
We describe an Xsuite simulation framework for the Fermilab Main Injector (MI) along with an evaluation of transition-crossing behaviors in the accelerator. In particular, we studied the introduction of quadrupole magnets into the lattice…
The fast extraction kicker system is one of the most important accelerator components, whose inner structure will be the main source of the impedance in the RCS. It is necessary to understand the kicker impedance before its installation…