Related papers: A gap clearing kicker for Main Injector
Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV proton Fermilab Booster. Here we report the results of comprehensive experimental studies of various beam intensity…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…
High energy and high beam power accelerators are extensively used for the neutrino physics research. At present, the leading operational facilities are the Fermilab Main Injector complex that delivers over 0.75 MW of 120 GeV protons on the…
With the new GSI High Current Injector, the beam pulse intensity will be increased by more than two orders of magnitude. The high beam power and the short stopping range at particle energies below 12 MeV/u can destroy accelerator components…
We describe the status of the Main Injector particle production Experiment (MIPP) at Fermilab which has to date acquired 18 million events of particle interactions using (5 GeV/c-120 GeV/c) $\pi^\pm, K^\pm$ and $p^\pm$ beams on various…
We describe the physics capabilites and status of the MIPP experiment which is scheduled to enter its physics data taking period during December 2004-July 2005. We show some of the results obtained from the engineering run that concluded in…
The CLIC damping rings will produce ultra-low emittance beam, with high bunch charge, necessary for the luminosity performance of the collider. To limit the beam emittance blow-up due to oscillations, the pulse power modulators for the…
A feed-forward ramp can be implemented in Booster to compensate the beam energy loss at different beam intensities for the purpose of minimizing the radial error signal. This can be done only when we have a good understanding about the…
The Fermilab Proton-Improvement-Plan-II (PIP-II) is being implemented in order to support the precision neutrino oscillation measurements at the Deep Underground Neutrino Experiment, the U.S. flagship neutrino experiment. The PIP-II LINAC…
A 2.1 MeV, 10 mA CW RFQ has been installed and commissioned at Fermilab's test accelerator known as PIP-II Injector Test. This report describes the measurements of the beam properties after acceleration in the RFQ, including the energy and…
In this article, we share our experience related to the new photo-injector commissioning at the SPARC\_LAB test facility. The new photo-injector was installed into an existing machine and our goal was not only to improve the final beam…
We have developed a computer program interfaced with the ACNET environment of Fermilab accelerators to measure energy spread of the proton beam from the LINAC at an injection into the Booster. It uses a digitizing oscilloscope and provides…
At the Fermilab Booster, and many other proton facili-ties, an intense proton beam is accumulated by multi-turn injection of an H- beam through a stripping foil. The circu-lating beam scatters off the injection foil and large-angle Coulomb…
Ionization profile monitors (IPMs) are used in the Fermilab Main Injector (MI) to monitor injection lattice matching by measuring turn-by-turn sigmas at injection and to measure transverse emittance of the beam during the acceleration…
The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and…
The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac…
Construction of the new fourth generation synchrotron radiation facility (SRF) "SKIF" near Novosibirsk is nearing completion. "SKIF" uniqueness is ultra-low 75 pm natural emittance at 400 mA beam current and 3 GeV beam energy. Collective…
We examine the potential impacts to slip-stacking from a change of the Booster cycle-rate from 15- to 20-Hz. We find that changing the Booster cycle-rate to 20-Hz would greatly increase the slip-stacking bucket area, while potentially…
The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the…