Related papers: A gap clearing kicker for Main Injector
The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster…
The readout electronics for the resonant beam position monitors (BPMs) in the Fermilab Switchyard (SY) have been upgraded, utilizing a low noise amplifier transition board and Fermilab designed digitizer boards. The stripline BPMs are…
During the 2011 run of the LHC there was a significant measured temperature increase in the LHC Injection Kicker Magnets (MKI) during operation with 50ns bunch spacing. This was due to increased beam-induced heating of the magnet due to…
The SPEAR 3 upgrade lattice will provide much reduced beam emittance to increase the brightness of synchrotron radiation beams from wigglers and undulators. Seven existing insertion devices will be used in the lattice. In this paper we…
The Project X Injector Experiment (PXIE), a test bed for the Project X front end, will be completed at Fermilab at FY12-16. One of the challenging goals of PXIE is demonstration of the capability to form a 1 mA H- beam with an arbitrary…
An overview is given of the methods and preliminary results from dedicated beam studies on three topics conducted over five days in July 2023. In the first study, the Fermilab Booster magnets were held constant at magnetic fields…
The Fermilab accelerator complex delivers intense high-energy proton beams to a variety of fixed-target scientific programs, including a flagship long-baseline neutrino program. With the advent of the Deep Underground Neutrino Experiment…
For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these…
A new Higher Order Mode (HOM) damper was designed and tested for the Booster accelerator cavity at Fermilab. In anticipation of the PIP-II upgrade, it was discovered that the higher beam intensity of PIP-II may cause beam instability due to…
The NO{\nu}A Experiment will construct a detector optimized for electron neutrino detection in the existing NuMI neutrino beam. The NuMI beam line is capable of operating at 400 kW of primary beam power and the upgrade will allow up to 700…
Fermilab carries out an extensive program of accelerator-based high energy particle physics research at the Intensity Frontier that relies on the operation of 8 GeV and 120 GeV proton beamlines for a number of fixed target experiments.…
The performance of scintillator counters with embedded wavelength-shifting fibers has been measured in the Fermilab Meson Test Beam Facility using 120 GeV protons. The counters were extruded with a titanium dioxide surface coating and two…
The ICARUS liquid argon TPC detector is taking data on the Booster (BNB) and Main Injector (NuMI) Neutrino beam lines at Fermilab with a trigger system based on the scintillation light produced by charged particles in coincidence with the…
Coupler RF kick due to the asymmetric structure caused by the coupler, is more likely to lead to emittance growth in the SHINE injector with low beam energy. The calculation of coupler RF kick and resulting emittance dilution has been…
In this paper, deep sub-micron CMOS process compatible high Q on chip spiral inductors with air gap structure were designed and fabricated. In the design the electromagnetic were used for electrical-characteristics and maximum mechanical…
One of the main concerns in the design of low emittance linear accelerators (linacs) is the preservation of beam emittance. Here we discuss one possible source of emittance dilution, the coupler kick, due to transverse electromagnetic…
We report the results of a recent beam dynamics study, motivated by the need to redesign the LCLS photoinjector, that lead to the discovery of a new effective working point for a split RF photoinjector. We consider the emittance…
This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development…
We have reported previously on the conditioning of the high-gradient accelerating cavities in the Fermilab Linac. Automated measurements of the sparking rate have been recorded since 1994 and are reported here. The sparking rate has…
The Fermilab Linac accepts the 0.75 MeV H- ions from the front end and accelerates them to 400 MeV for injection into the Booster. Day-to-day drifts of the longitudinal trajectory in the Linac, reconstructed from phase readings of Beam…