Related papers: An efficient polynomial time approximation scheme …
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
In this paper we consider the problem of scheduling on parallel machines with a presence of incompatibilities between jobs. The incompatibility relation can be modeled as a complete multipartite graph in which each edge denotes a pair of…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector, are among the oldest and most fundamental tasks in combinatorial optimization. Since all of…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
Reallocation scheduling is one of the most fundamental problems in various areas such as supply chain management, logistics, and transportation science. In this paper, we introduce the reallocation problem that models the scheduling in…
Recently, the problem of multitasking scheduling has attracted a lot of attention in the service industries where workers frequently perform multiple tasks by switching from one task to another. Hall, Leung and Li (Discrete Applied…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
A central problem in scheduling is to schedule $n$ unit size jobs with precedence constraints on $m$ identical machines so as to minimize the makespan. For $m=3$, it is not even known if the problem is NP-hard and this is one of the last…
Coflow is a prominent network abstraction for modeling communication patterns in data centers. Since coflow scheduling in large-scale data centers is $\mathcal{NP}$-hard, this paper investigates this problem within heterogeneous parallel…
Consider the classical Min-Sum Set Cover problem: We are given a universe $\mathcal{U}$ of $n$ elements and a collection $\mathcal{S}$ of $k$ subsets of $\mathcal{U}$. Moreover, a cost function is associated with each set. The goal is to…
We study policies aiming to minimize the weighted sum of completion times of jobs in the context of coordination mechanisms for selfish scheduling problems. Our goal is to design local policies that achieve a good price of anarchy in the…
We consider the problem of scheduling $n$ precedence-constrained jobs on $m$ uniformly-related machines in the presence of an arbitrary, fixed communication delay $\rho$. We consider a model that allows job duplication, i.e. processing of…
Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with…
This article is devoted to propose some lower and upper bounds for the coupled-tasks scheduling problem in presence of compatibility constraints according to classical complexity hypothesis ($\mathcal{P} \neq \mathcal{NP}$,…