Related papers: An efficient polynomial time approximation scheme …
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…
We consider two optimization problems in planar graphs. In Maximum Weight Independent Set of Objects we are given a graph $G$ and a family $\mathcal{D}$ of objects, each being a connected subgraph of $G$ with a prescribed weight, and the…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
We consider the problem of scheduling jobs with equal lengths on uniform parallel batch machines with non-identical capacities where each job can only be processed on a specified subset of machines called its processing set. For the case of…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…
For scheduling in flexible manufacturing system (FMS), many factors should be considered, it is difficult to solve the scheduling problem by satisfying different criteria (production cost, utilization of system, number of movements of part,…
We develop a framework for obtaining polynomial time approximation schemes (PTAS) for a class of stochastic dynamic programs. Using our framework, we obtain the first PTAS for the following stochastic combinatorial optimization problems:…
The interval subset sum problem (ISSP) is a generalization of the well-known subset sum problem. Given a set of intervals $\left\{[a_{i,1},a_{i,2}]\right\}_{i=1}^n$ and a target integer $T,$ the ISSP is to find a set of integers, at most…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
Scheduling with assignment restrictions is an important special case of scheduling unrelated machines which has attracted much attention in the recent past. While a lower bound on approximability of 3/2 is known for its most general…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
We revisit a classical scheduling model to incorporate modern trends in data center networks and cloud services. Addressing some key challenges in the allocation of shared resources to user requests (jobs) in such settings, we consider the…
In this paper the problem of scheduling of jobs on parallel machines under incompatibility relation is considered. In this model a binary relation between jobs is given and no two jobs that are in the relation can be scheduled on the same…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
We develop a general framework for designing polynomial-time approximation schemes (PTASs) for various vehicle routing problems in trees. In these problems, the goal is to optimally route a fleet of vehicles, originating at a depot, to…
Time-dependent scheduling with linear deterioration involves determining when to execute jobs whose processing times degrade as their beginning is delayed. Each job i is associated with a release time r_i and a processing time function…