Related papers: Front-End electronics configuration system for CMS
The Detector Safety System (DSS), currently being developed at CERN under the auspices of the Joint Controls Project (JCOP), will be responsible for assuring the protection of equipment for the four LHC experiments. Thus, the DSS will…
The Framework is one of the subprojects of the Joint COntrols Project (JCOP), which is collaboration between the four LHC experiments and CERN. By sharing development, this will reduce the overall effort required to build and maintain the…
The Detector Control System (DCS) of the COMPASS experiment at CERN is presented. The experiment has a high level of complexity and flexibility and a long time of operation, that constitute a challenge for its full monitorisation and…
The innermost part of the ATLAS experiment will be a pixel detector containing around 1750 individual detector modules. A detector control system (DCS) is required to handle thousands of I/O channels with varying characteristics. The main…
After the successful conclusion of the CLEO III phase, the CLEO experiment at the Cornell Electron Positron Storage Ring CESR is preparing for its transition to CLEO-c. This new program contains a wide array of Physics studies at e+ e-…
The LHCb experiment(Fig. 1), that is presently taking data at CERN (European Center for Nuclear Research) Large Hadron Collider (LHC), aims at the study of CP violation in the B meson sector. Its key elements is the Muon detector [1], which…
The CMS (Compact Muon Solenoid) experiment is one of the two large general-purpose particle physics detectors built at the LHC (Large Hadron Collider) at CERN in Geneva, Switzerland. The diverse collaboration combined with a highly…
The CMS experiment at the LHC accelerator at CERN relies on its computing infrastructure to stay at the frontier of High Energy Physics, searching for new phenomena and making discoveries. Even though computing plays a significant role in…
The globally distributed computing infrastructure required to cope with the multi-petabytes datasets produced by the Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN comprises several subsystems, such as…
The SNS Project intends to integrate Conventional Facility Controls with its EPICS-based Accelerator and Target Control Systems. EPICS will therefore be used to provide distributed high-level access to all subsystems of the SNS conventional…
In 2017, the LHC (Large Hadron Collider) at CERN has obtained an astonishing result providing proton-proton collisions with an integrated luminosity of 50.25 fb-1. The CMS (Compact Muon Solenoid), a general-purpose detector operating at the…
The CMS experiment will comprise several very large high resolution detectors for physics. Each detector may be constructed of well over a million parts and will be produced and assembled during the next decade by specialised centres…
The CMS experiment at CERN has released research-quality data from particle collisions at the LHC since 2014. Almost all data from the first LHC run in 2010-2012 with the corresponding simulated samples are now in the public domain, and…
This paper presents a modern and scalable framework for analyzing Detector Control System (DCS) data from the ATLAS experiment at CERN. The DCS data, stored in an Oracle database via the WinCC OA system, is optimized for transactional…
The LIGO Control and Data system (CDS) features a tightly coupled and highly integrated control and data acquisition system. Control of the interferometers requires many Multiple Input Multiple Output (MIMO) control loops closed both…
Since its inception in the early 1980's, the SLC control system has been driven by a highly structured memory resident real-time database. While efficient, its rigid structure and file-based sources makes it difficult to maintain and…
The Advanced Photon Source is now in its fifth year of routine beam production. The EPICS-based [1] control system has entered the phase in its life cycle where new control algorithms must be implemented under increasingly stringent…
We will use EPICS toolkit [1] to build a prototype for upgrading BEPC control system. The purposes are for the following three aspects: (1) Setup a network based distributed control system with EPICS. (2) Study some front-end control…
Numerous IoT applications, like building automation or process control of industrial sites, exist today. These applications inherently have a strong connection to the physical world. Hence, IT security threats cannot only cause problems…
Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules.…