Related papers: Beam Feedback Systems and BPM Read-out System for …
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam…
Beam injections to KEKB and Photon Factory are performed with pulse-to-pulse modulation at 50 Hz. Three very different beams are switched every 20 ms in order to inject those beams into KEKB HER, LER and Photon Factory (PF) simultaneously.…
A high-precision intra-bunch-train beam orbit feedback correction system has been developed and tested in the ATF2 beamline of the Accelerator Test Facility at the High Energy Accelerator Research Organization in Japan. The system uses the…
In order to achieve its ambitious luminosity target, the SuperKEKB collider must achieve and sustain high beam currents on the order of Ampere in its storage rings. This requires continuous top-up injection and operation with a two-bunch…
In order to ensure the beam quality and meet the requirements introduced by the BEPCII storage ring, the beam energy feedback system has been developed at the exit of the linac. This paper describes the implementation and commissioning of…
Recirculating energy recovery linacs are a promising technology for delivering high power particle beams ($\sim$GW) while only requiring low power ($\sim$kW) RF sources. This is achieved by decelerating the used bunches and using the energy…
The new method to stabilize the beam energy of the KEK 40MeV proton linac, is developed now. In this method, the signal of the velocity monitor installed upstream the debuncher in the 40MeV beam line, is processed and then fed to the phase…
KEK-ATF is studying low emittance, multi-bunch electron beam for the future linear collider. The energy instability of the 1.5 GeV linac has been a problem making the beam injection to the damping ring unstable. Because the unstable beam…
Injected beam energy and energy spread are critical parameters affecting the performance of our rapid cycling synchrotron (RCS). A real-time energy monitoring system is being installed to examine the H- beam out of the Intense Pulsed…
We report the design, operation and performance of a high-resolution, low-latency, bunch-by-bunch feedback system for nano-beam stabilisation. The system employs novel, ultra-low quality-factor cavity beam position monitors (BPMs), a…
A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a…
Here we will derive the general theory of the beam-breakup instability in recirculating linear accelerators, in which the bunches do not have to be at the same RF phase during each recirculation turn. This is important for the description…
KEK electron linac was upgraded to 8 GeV for the KEK B-Factory (KEKB) project. During the commissioning of the upgraded linac, even continuing SOR ring injections, we had achieved a primary electron beam with 10-nC (6.24 x 10^10) per bunch…
A 52MHz Radio Frequency Quadrupole (RFQ) linear accelerator (linac) is designed to serve as an initial structure for the SSC-linac system (injector into Separated Sector Cyclotron). The designed injection and output energy are 3.5 keV/u and…
Coupled-bunch instabilities excited by the interaction of the particle beam with its surroundings can seriously limit the performance of circular particle accelerators. These instabilities can be cured by the use of active feedback systems…
KEKB completed all of the technical milestones, and had offered important insights into the flavor structure of elementary particles, especially the CP violation. The accelerator control system at KEKB and injector linac was initiated by a…
Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a…
In this paper, some preliminary considerations on the feedback systems for FCC-ee are developed. Bunch-by-bunch feedback systems have been designed in the last years for other e+/e- colliders like PEP-II, KEKB, DAFNE, SuperB and SuperKEKB.…
Beam breakup instability is a potential issue for all particle accelerators and is often the limiting factor for the maximum beam current that can be achieved. This is particularly relevant for Energy Recovery Linacs with multiple passes…
Recording changes in beam transverse positions re-ported by Beam Position Monitors (BPMs) in response to a beam deflection by an upstream dipole corrector (orbit response) is a powerful tool for analysis of accelerator optics and assisting…