Related papers: Beam Feedback Systems and BPM Read-out System for …
The timing system of SPring-8 booster synchrotron generates various timing signals concerning beam injection, acceleration from 1 GeV to 8 GeV and ejection. We have improved the timing system of the synchrotron giving it better stability…
A problem of coupled-beam instability is solved for two multibunch beams with slightly different revolution frequencies, as in the Fermilab Recycler Ring (RR). Sharing of the inter-bunch growth rates between the intra-bunch modes is…
Optical properties of components in a linac can be reconstructed from analysis of the orbit response matrix, composed from responses of BPMs to changes in currents of dipole correctors. An efficient way to record such response, discussed in…
The first phase of the HIE-ISOLDE project at CERN consists of a superconducting (SC) linac upgrade in order to increase the energy of post-accelerated radioactive ion beams from 2.8 MeV/u to over 10 MeV/u (for A/q = 4.5). In preparation for…
The maximum achievable beam current in an Energy Recovery Linac (ERL) is often constrained by Beam Breakup (BBU) instability. Our previous research highlighted that filling patterns have a substantial impact on BBU instabilities in…
In the NLC project multiple bunches of electrons and positrons will be accelerated initially to a centre of mass of 500 GeV and later to 1 TeV or more. In the process of accelerating 192 bunches within a pulse train, wakefields are excited…
In current accelerators, numerous parameters and monitored values are to be adjusted and evaluated, respectively. In addition, fine adjustments are required to achieve the target performance. Therefore, the conventional…
A system was developed for bunch-by-bunch detection of transverse proton and antiproton coherent oscillations based on the signal from a single beam-position monitor (BPM) located in a region of the ring with large amplitude functions. The…
Here, we introduce Linac_Gen, a tool developed at Fermilab, which combines machine learning algorithms with Particle-in-Cell methods to advance beam dynamics in linacs. Linac_Gen employs techniques such as Random Forest, Genetic Algorithms,…
LINAC 4 is a normal conducting H- structure proposed to intensify the proton flux currently available for the CERN accelerator chain. This linac is designed to accelerate a 65 mA beam up to 160 MeV to be injected into the CERN Proton…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
Extensive beam-based feedback systems are planned as an integral part of the Next Linear Collider (NLC) control system. Wakefield effects are a significant influence on the feedback design, imposing both architectural and algorithmic…
For the PIP-II program, transverse emittance in the Fermilab Booster must remain well controlled at higher bunch intensities. 4-plate beam position monitors (BPMs) have a small but measurable quadrupole moment, making it possible to infer…
A system for bunch-by-bunch detection of transverse proton and antiproton coherent oscillations in the Tevatron is described. It is based on the signal from a single beam-position monitor located in a region of the ring with large amplitude…
The BPM system in Booster only can provide the beam position from the average of about 15 bunches due to the electronic limitation. Numerically calculating the difference made by this average can nearly give all the information, which is…
In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…
The China spallation neutron source (CSNS) linac is designed with beam energy of 81MeV and a peak current of 15mA in the first phase. The RF power system for the 81 MeV Linac requires 8 units of RF power sources, each unit has one…
The Fermilab Side-Coupled Linac accelerates H-beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster…
"LUE200" - 200 MeV electron linac is being created at JINR as a driver of the pulsed neutron source "IREN" [1]. The special full-scale facilities for testing the main systems of LUE-200 (FSTF) are used at JINR, BINP, MEPhI and YerPhI [2].…
Beam-line equipment was upgraded for experiment E08-027 (g2p) in Hall A at Jefferson Lab. Two beam position monitors (BPMs) were necessary to measure the beam position and angle at the target. A new BPM receiver was designed and built to…