Related papers: U-70 Proton Synchrotron Extracted Beam Lines Contr…
The CERN Large Hadron Collider (LHC) is designed to collide proton beams of unprecedented energy, in order to extend the frontiers of high-energy particle physics. During the first very successful running period in 2010--2013, the LHC was…
A line driver with configurable pre-emphasis is implemented in a 65 nm CMOS process. The driver utilizes a three-tap feed-forward equalization (FFE) architecture. The relative delays between the taps are selectable in increments of 1/16th…
By the end of the nineties, the power converter control system (Mugef) of the CERN proton accelerator (SPS) had undergone a complete modernization. This resulted in newly developed hardware for function generation, measurement and I/O in a…
A PC based high speed silicon microstrip beam telescope consisting of several independent modules is presented. Every module contains an AC-coupled double sided silicon microstrip sensor and a complete set of analog and digital signal…
The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at…
A high precision beam monitor system based on silicon carbide PIN sensor is designed for China Spallation Neutron Source 1.6 GeV proton beam to monitor the proton beam fluence.The concept design of the beam monitor system is finished…
Measurement of high-power proton beam-halo formation is the ongoing scientific experiment for the Low Energy Demonstration Accelerator (LEDA) facility. To attain this measurement goal, a 52-magnet beam line containing several types of beam…
The control system of the VEPP-4 facility was designed more than fifteen years ago and based on the home-developed CAMAC-embedded minicomputers Odrenok [1]. Five years ago, all computers were connected via Ethernet network. This step…
The protection of accelerator equipment is as old as accelerator technology and was for many years related to high-power equipment. Examples are the protection of powering equipment from overheating (magnets, power converters, high-current…
The CERN fixed target experimental areas are composed of more than 8 km of beam lines with around 800 devices used to define and monitor the beam parameters. Each year more than 140 groups of users come to perform experiments in these…
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix…
On-line monitoring of beam quality for high brightness beams is only possible using non-invasive instruments. For matching measurements, very few such instruments are available. One candidate is a quadrupole pick-up. Therefore, a new type…
Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…
A system for online measurement of the transverse beam emittance was developed. It is named $^{4}$PrOB$\varepsilon$aM (4-Profiler Online Beam Emittance Measurement) and was conceived to measure the emittance in a fast and efficient way…
Electron beam stabilization in a synchrotron is a disturbance rejection problem, with hundreds of inputs and outputs, that is sampled at frequencies higher than $10$ kHz. In this feasibility study, we focus on the practical issues of an…
This report sums up in two volumes the first 50 years of operation of the CERN Proton Synchrotron. After an introduction on the genesis of the machine, and a description of its magnet and powering systems, the first volume focuses on some…
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam…
Any future high energy e+e- linear collider aims at precision measurements of Standard Model quantities as well as of new, not yet discovered phenomena. In order to pursue this physics programme, excellent detectors at the interaction…
The Main Injector (MI) was commissioned using data acquisition systems developed for the Fermilab Main Ring in the 1980s. New VME-based instrumentation was commissioned in 2006 for beam loss monitors (BLM)[2], which provided a more…
The ITER neutral beam cell will contain up to three heating neutral beams and one diagnostic neutral beam, and four upper ports. Though manual maintenance work is envisaged within the cell, when containment is breached, or the radiological…