Related papers: Improved Approximation Algorithms for Non-Preempti…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…
We consider the classic problem of scheduling jobs with precedence constraints on a set of identical machines to minimize the makespan objective function. Understanding the exact approximability of the problem when the number of machines is…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
In this paper, we consider the problem of scheduling an application on a parallel computational platform. The application is a particular task graph, either a linear chain of tasks, or a set of independent tasks. The platform is made of…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
In the unsplittable flow problem on a path, we are given a capacitated path $P$ and $n$ tasks, each task having a demand, a profit, and start and end vertices. The goal is to compute a maximum profit set of tasks, such that for each edge…
In this paper, we study an NP-hard problem of a single machine scheduling minimizing the makespan, where the mixed-critical tasks with an uncertain processing time are scheduled. We show the derivation of F-shaped tasks from the probability…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
We introduce a parallel machine scheduling problem in which the processing times of jobs are not given in advance but are determined by a system of linear constraints. The objective is to minimize the makespan, i.e., the maximum job…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…