As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and…
Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…
Real world networks are often subject to severe uncertainties which need to be addressed by any reliable prescriptive model. In the context of the maximum flow problem subject to arc failure, robust models have gained particular attention.…
We study the problem of preemptive scheduling n jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. We show that when all jobs have equal processing times then the problem can…
In the $2$-Machine Flow Shop problem with exact delays the operations of each job are separated by a given time lag (delay). Leung et al. (2007) established that the problem is strongly NP-hard when the delays may have at most two different…
Both bilevel and robust optimization are established fields of mathematical optimization and operations research. However, only until recently, the similarities in their mathematical structure has neither been studied theoretically nor…
Since its development in the early 90's, parameterized complexity has been widely used to analyze the tractability of many NP-hard combinatorial optimization problems with respect to various types of problem parameters. While the generic…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
This paper presents a mixed-integer linear programming formulation for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. We consider a two-stage robust optimisation approach and find solutions…
In this paper, we are interested in parallel identical machine scheduling problems with preemption and release dates in case of a regular criterion to be minimized. We show that solutions having a permutation flow shop structure are…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
A standard type of uncertainty set in robust optimization is budgeted uncertainty, where an interval of possible values for each parameter is given and the total deviation from their lower bounds is bounded. In the two-stage setting,…
Flowshop machine scheduling has been of main interest in several applications where the timing of its processes plays a fundamental role in the utilization of system resources. Addressing the optimal sequencing of the jobs when equivalent…
In this work, we consider a scheduling problem faced by production companies with large electricity consumption. Due to the contract with the electric utility, the production companies are obligated to comply with the total energy…
Recoverable robust optimization is a multi-stage approach, where it is possible to adjust a first-stage solution after the uncertain cost scenario is revealed. We analyze this approach for a class of selection problems. The aim is to choose…
We extend Robust Optimization to fractional programming, where both the objective and the constraints contain uncertain parameters. Earlier work did not consider uncertainty in both the objective and the constraints, or did not use Robust…
Budgeted uncertainty sets have been established as a major influence on uncertainty modeling for robust optimization problems. A drawback of such sets is that the budget constraint only restricts the global amount of cost increase that can…
We consider Johnson's rule for minimizing the makespan in the two-machine flow shop problem. Although its worst-case time complexity is O(n log n), we show that it is possible to detect in linear time whether a full sorting of jobs can be…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
We study single-stage decision problems in which a subset of items with minimum total cost has to be selected at once from a given set of items, subject to two costs of each item -fixed and uncertain -and cardinality constraints for each…