This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…
This paper presents a novel idea for the general case of the Common Due-Date (CDD) scheduling problem. The problem is about scheduling a certain number of jobs on a single or parallel machines where all the jobs possess different processing…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
We study shared processor scheduling of $\textit{multiprocessor}$ weighted jobs where each job can be executed on its private processor and simultaneously on possibly $\textit{many}$ processors shared by all jobs in order to reduce their…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
The non-preemptive job scheduling problem with release times and deadlines on a single machine is fundamental to many scheduling problems. We parameterize this problem by the set of job lengths the jobs can have. The case where all job…
This paper addresses the scheduling problem of minimizing the total weighted tardiness on a single machine with step-deteriorating jobs. With the assumption of deterioration, the job processing times are modeled by step functions of job…
This paper resolves a long-standing open question in bicriteria scheduling regarding the complexity of a single machine scheduling problem which combines the number of tardy jobs and the maximal tardiness criteria. We use the lexicographic…
In this paper, we proposed an effective approach for scheduling of multiprocessor unit time tasks with chain precedence on to large multiprocessor system. The proposed longest chain maximum processor scheduling algorithm is proved to be…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…