English
Related papers

Related papers: ALS Storage Ring RF Control System Upgrade Plan an…

200 papers

The upgrade of the Inner Tracking System (ITS) of ALICE is planned for the second long shutdown of the LHC in 2019-2020. The ALICE physics program after the shutdown requires the ITS to have improved tracking capabilities and improved…

Instrumentation and Detectors · Physics 2015-11-30 Monika Kofarago

After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC…

Instrumentation and Detectors · Physics 2014-08-29 Walter Hopkins

The first version of digital low level RF (DLLRF) for the Diamond Light Source storage ring and booster was developed with ALBA Synchrotron. Six systems have been built so far. Two of them are in routine operation controlling two normal…

Accelerator Physics · Physics 2022-10-10 P Gu , C. Christou , P. Hamadyk , G. B. Christian , D. Spink , A. Tropp

Louisiana State University Center for Advanced Microstructures and Devices (CAMD) began a control system upgrade project in early 1997. At the time, the storage ring was controlled by a VAX/VMS system, primarily using CAMAC for I/O. The…

Accelerator Physics · Physics 2007-05-23 P. Jines , B. Craft

ALICE is the experiment at the CERN LHC devoted to study heavy-ion collisions. An upgrade program of the ALICE detector is ongoing toward the LHC Run 3 starting in 2022 together with the upgrade of the data acquisition system and the…

Instrumentation and Detectors · Physics 2020-12-30 K. Yamakawa , A. Augustinus , G. Batigne , P. Chochula , M. Oya , S. Panebianco , O. Pinazza , K. Shigaki , R. Tieulent , Y. Yamaguchi

The injection control system of Hefei Light Source (HLS) storage ring is a subsystem of the upgraded HLS control system, which is based upon EPICS. Three programmable logic controllers (PLCs) are used as device controllers, which control…

Accelerator Physics · Physics 2007-05-23 Gongfa Liu , Jingyi Li , Weimin Li , Chuan Li , Kaihong Li , Lei Shang

An S-band linear accelerator is the source of particles and the front end of the Advanced Photon Source injector. In addition, it supports a low-energy undulator test line (LEUTL) and drives a free-electron laser (FEL). A…

Accelerator Physics · Physics 2019-08-17 A. E. Grelick , N. Arnold , S. Berg , D. Dohan , G. Goeppner , Y. W. Kang , A. Nassiri , S. Pasky , G. Pile , T. Smith , S. J. Stein

In 2023, we are replacing the LLRF system for the KEK-PF 2.5 GeV ring. The new system is composed of digital boards such as eRTM, AMC, and {\mu}RTM, based on the MTCA.4 standard. In our system, we adopted the non-IQ direct sampling method…

Accelerator Physics · Physics 2023-10-24 D. Naito , N. Yamamoto , T. Takahashi , A. Motomura , S. Sakanaka

The ALICE experiment at CERN has undergone a major upgrade during the Long Shutdown 2 of the LHC during 2019-2021. A key element is the installation of the new Inner Tracking System 2 (ITS2). The new ITS2 based on CMOS Monolithic Active…

Instrumentation and Detectors · Physics 2022-04-20 Felix Reidt

Sirius is a Synchrotron Light Source Facility based on a 4th generation low emittance storage ring. The facility is presently in the final assembly phase in Campinas, Brazil, and comprises a 3 GeV electron storage ring, a full energy…

Accelerator Physics · Physics 2019-10-21 A. P. B. Lima , F. K. G. Hoshino , C. F. Carneiro , R. H. A. Farias , A. Salom

To extend the physics reach of the LHC, accelerator upgrades are planned which will increase the integrated luminosity to beyond 3000 fb^-1 and the pile-up per bunch-crossing by a factor 5 to 10. To cope with the increased occupancy and…

Instrumentation and Detectors · Physics 2015-06-17 G. Calderini

The ALICE Collaboration completed the upgrade of the detector and is now commissioning for the beginning of the data taking during LHC Run 3. In parallel, R&D activities and simulation studies are being performed to define the future of the…

High Energy Physics - Experiment · Physics 2022-11-09 Domenico Colella , for the ALICE Collaboration

The LCLS began operations in 2009, utilizing SLAC's normal-conducting (NC) LINAC, which features control equipment dating back to the 1960s and 1980s. The Linac Electronics Modernization Plan (LEMP) aims to replace the legacy control…

The SLAC PES, developed in the early 1990s for the SLC, has been in continuous use since 1992, during which time it has undergone numerous upgrades. The upgrades include improved cathodes with their matching laser systems, modified…

Accelerator Physics · Physics 2009-11-07 J. E. Clendenin , A. Brachmann , T. Galetto , D. -A. Luh , T. Maruyama , J. Sodja , J. L. Turner

The ATLAS hadronic Tile Calorimeter will undergo major upgrades to the on- and off-detector electronics in preparation for the High Luminosity program of the Large Hadron Collider (HL-LHC) in 2026, so that the system can cope with the…

Instrumentation and Detectors · Physics 2020-08-26 Jalal Abdallah

SLAC National Accelerator Laboratory is collaborating with Arizona State University to design a LLRF system towards the advancement of the ASU Compact X-ray Light Source (CXLS). The CXLS is a phased project to develop small brilliant x-ray…

Accelerator Physics · Physics 2019-10-02 A. Young , J. M. D Ewart , J. Frisch , B. Hong , T. Straumann , M. Weaver , C. Xu

The ALICE detector is undergoing an upgrade for Run 3 at the LHC. A new Inner Tracking System (ITS) is part of this upgrade. The upgraded ALICE ITS features the ALPIDE, a Monolithic Active Pixel Sensor. Due to IC fabrication variations and…

Instrumentation and Detectors · Physics 2022-05-11 Shiming Yuan , Johan Alme , Markus Keil , Ivan Ravasenga , Matthias Richter , Dieter Röhrich

The LHC Phase-II upgrade will lead to a significant increase in luminosity, which in turn will bring new challenges for the operation of inner tracking detectors. A possible solution is to use active silicon sensors, taking advantage of…

During the high-luminosity phase of the LHC (HL-LHC), planned to start around 2027, the accelerator is expected to deliver an instantaneous peak luminosity of up to $7.5\times10^{34}$ cm$^{-2}$s$^{-1}$. A total integrated luminosity of…

Instrumentation and Detectors · Physics 2020-06-17 The Tracker Group of the CMS Collaboration

The Advanced Photon Source (APS) was commissioned in 1995 as a third-generation x-ray user facility. At that time orbit control was performed exclusively with broadband rf beam position monitors (BPMs). Since then, emphasis has been placed…

Instrumentation and Detectors · Physics 2010-11-15 Glenn Decker , Om Singh