MapReduce is a popular parallel computing paradigm for Big Data processing in clusters and data centers. It is observed that different job execution orders and MapReduce slot configurations for a MapReduce workload have significantly…
We consider online preemptive scheduling of jobs arriving one by one, to be assigned to two identical machines, with the goal of makespan minimization. We study the effect of selecting the best solution out of two independent solutions…
This paper studies the bicriteria problem of scheduling $n$ jobs on a serial-batch machine to minimize makespan and maximum cost simultaneously. A serial-batch machine can process up to $b$ jobs as a batch, where $b$ is known as the batch…
We consider scheduling two types of jobs (A-job and B-job) to $p$ machines and minimizing their makespan. A group of same type of jobs processed consecutively by a machine is called a batch. For machine $v$, processing $x$ A-jobs in a batch…
In shop scheduling, several applications exist where it is required that some components perform consecutively. We refer to no-idle schedules if machines are required to operate with no inserted idle time and no-wait schedules if tasks…
The Jobs shop Scheduling Problem (JSP) is a canonical combinatorial optimization problem that is routinely solved for a variety of industrial purposes. It models the optimal scheduling of multiple sequences of tasks, each under a fixed…
We study the problem of scheduling $n$ independent moldable tasks on $m$ processors that arises in large-scale parallel computations. When tasks are monotonic, the best known result is a $(\frac{3}{2}+\epsilon)$-approximation algorithm for…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
The problem of scheduling non-simultaneously released jobs with due dates on a single machine with the objective to minimize the maximum job lateness is known to be strongly NP-hard. Here we consider an extended model in which the…
We study the shared processor scheduling problem with a single shared processor where a unit time saving (weight) obtained by processing a job on the shared processor depends on the job. A polynomial-time optimization algorithm has been…
We consider a basic problem of preemptive scheduling of $n$ non-simultaneously released jobs on a group of $m$ unrelated parallel machines so as to minimize maximum job completion time, the makespan. In the scheduling literature, the…
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
Most classical scheduling formulations assume a fixed and known duration for each activity. In this paper, we weaken this assumption, requiring instead that each duration can be represented by an independent random variable with a known…
In 1976, Coffman and Sethi conjectured that a natural extension of LPT list scheduling to the bicriteria scheduling problem of minimizing makespan over flowtime optimal schedules, called LD algorithm, has a simple worst-case performance…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
We consider the Pm || Cmax scheduling problem where the goal is to schedule n jobs on m identical parallel machines to minimize makespan. We revisit the famous Longest Processing Time (LPT) rule proposed by Graham in 1969. LPT requires to…
In this paper, we are interested in parallel identical machine scheduling problems with preemption and release dates in case of a regular criterion to be minimized. We show that solutions having a permutation flow shop structure are…
Flowshop problems play a prominent role in operations research, and have considerable practical significance. The single-machine flowshop problem is of particular theoretical interest. Until now the problem of minimizing late jobs or job…