Related papers: Revisiting Johnson's rule for minimizing makespan …
Flexible job shop scheduling has been noticed as an effective manufacturing system to cope with rapid development in today's competitive environment. Flexible job shop scheduling problem (FJSSP) is known as a NP-hard problem in the field of…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
We consider the problem of makespan minimization on unrelated machines when job sizes are stochastic. The goal is to find a fixed assignment of jobs to machines, to minimize the expected value of the maximum load over all the machines. For…
Makespan minimization on identical machines is a fundamental problem in online scheduling. The goal is to assign a sequence of jobs to $m$ identical parallel machines so as to minimize the maximum completion time of any job. Already in the…
We study approximation algorithms for the problem of minimizing the makespan on a set of machines with uncertainty on the processing times of jobs. In the model we consider, which goes back to~\cite{BertsimasS03}, once the schedule is…
We consider an online scheduling problem, motivated by the issues present at the joints of networks using ATM and TCP/IP. Namely, IP packets have to broken down to small ATM cells and sent out before their deadlines, but cells corresponding…
We study the periodic assignment problem, in which a set of periodically repeating tasks must be assigned to workers within a repeating schedule. The classical efficiency objective is to minimize the number of workers required to operate…
This paper considers scheduling on identical machines. The scheduling objective considered in this paper generalizes most scheduling minimization problems. In the problem, there are $n$ jobs and each job $j$ is associated with a…
We study the problem of non-preemptively scheduling $n$ jobs, each job $j$ with a release time $t_j$, a deadline $d_j$, and a processing time $p_j$, on $m$ parallel identical machines. Cieliebak et al. (2004) considered the two constraints…
The class $(r,2)$-CSP, or simply Max 2-CSP, consists of constraint satisfaction problems with at most two $r$-valued variables per clause. For instances with $n$ variables and $m$ binary clauses, we present an $O(n r^{5+19m/100})$-time…
The best-worst method is an increasingly popular approach to solving multi-criteria decision-making problems. However, the usual prioritisation techniques may result in an ordinal violation if the best (worst) alternative identified in the…
In parallel machine scheduling, we are given a set of jobs, together with a number of machines and our goal is to decide for each job, when and on which machine(s) it should be scheduled in order to minimize some objective function.…
We significantly improve known time bounds for solving the minimum cut problem on undirected graphs. We use a ``semi-duality'' between minimum cuts and maximum spanning tree packings combined with our previously developed random sampling…
Consider the problem in which n jobs that are classified into k types are to be scheduled on m identical machines without preemption. A machine requires a proper setup taking s time units before processing jobs of a given type. The…
Split learning (SL) has been recently proposed as a way to enable resource-constrained devices to train multi-parameter neural networks (NNs) and participate in federated learning (FL). In a nutshell, SL splits the NN model into parts, and…
Generalizing many well-known and natural scheduling problems, scheduling with job-specific cost functions has gained a lot of attention recently. In this setting, each job incurs a cost depending on its completion time, given by a private…
We consider the classical scheduling problem on a single machine, on which we need to schedule sequentially $n$ given jobs. Every job $j$ has a processing time $p_j$ and a priority weight $w_j$, and for a given schedule a completion time…
We consider the longest common subsequence (LCS) problem with the restriction that the common subsequence is required to consist of at least $k$ length substrings. First, we show an $O(mn)$ time algorithm for the problem which gives a…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
Online scheduling has been a well studied and challenging research problem over the last five decades since the pioneering work of Graham with immense practical significance in various applications such as interactive parallel processing,…