Related papers: A $(2+\varepsilon)$-approximation algorithm for th…
In this paper we consider single machine scheduling problems with additional non-renewable resource constraints. Examples for non-renewable resources include raw materials, energy, or money. Usually they have an initial stock and…
We consider the Demand Strip Packing problem (DSP), in which we are given a set of jobs, each specified by a processing time and a demand. The task is to schedule all jobs such that they are finished before some deadline $D$ while…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
We give a polynomial time reduction from vector scheduling problem (VS) to generalized load balancing problem (GLB). This reduction gives the first non-trivial online algorithm for VS where vectors come in an online fashion. The online…
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…
We present a near-optimal polynomial-time approximation algorithm for the asymmetric traveling salesman problem for graphs of bounded orientable or non-orientable genus. Our algorithm achieves an approximation factor of O(f(g)) on graphs…
We extend the concept of polynomial time approximation algorithms to apply to problems for hierarchically specified graphs, many of which are PSPACE-complete. Assuming P != PSPACE, the existence or nonexistence of such efficient…
We consider single-machine scheduling problems that are natural generalizations or variations of the min-sum set cover problem and the min-sum vertex cover problem. For each of these problems, we give new approximation algorithms. Some of…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
In the Demand Strip Packing problem (DSP), we are given a time interval and a collection of tasks, each characterized by a processing time and a demand for a given resource (such as electricity, computational power, etc.). A feasible…
We study the generalized load-balancing (GLB) problem, where we are given $n$ jobs, each of which needs to be assigned to one of $m$ unrelated machines with processing times $\{p_{ij}\}$. Under a job assignment $\sigma$, the load of each…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
Coflow is a network abstraction used to represent communication patterns in data centers. The coflow scheduling problem encountered in large data centers is a challenging $\mathcal{NP}$-hard problem. This paper tackles the scheduling…
The Restricted Assignment Problem is a prominent special case of Scheduling on Parallel Unrelated Machines. For the strongest known linear programming relaxation, the configuration LP, we improve the non-constructive bound on its…
This paper explores fast, polynomial time heuristic approximate solutions to the NP-hard problem of scheduling jobs on N identical machines. The jobs are independent and are allowed to be stopped and restarted on another machine at a later…
We propose new abstract and unified perspectives on a range of scheduling and graph coloring problems with general min-sum objectives. Specifically, we consider various problems where the objective function is the weighted sum of completion…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…
Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test…