We consider the Demand Strip Packing problem (DSP), in which we are given a set of jobs, each specified by a processing time and a demand. The task is to schedule all jobs such that they are finished before some deadline $D$ while…
In this paper, we study an NP-hard problem of a single machine scheduling minimizing the makespan, where the mixed-critical tasks with an uncertain processing time are scheduled. We show the derivation of F-shaped tasks from the probability…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
The paper considers single-machine scheduling problems with a non-renewable resource. In this setting, we are given a set jobs, each of which is characterized by a processing time, a weight, and the job also has some resource requirement.…
We study the Parallel Task Scheduling problem $Pm|size_j|C_{\max}$ with a constant number of machines. This problem is known to be strongly NP-complete for each $m \geq 5$, while it is solvable in pseudo-polynomial time for each $m \leq 3$.…
We consider a variant of the NP-hard problem of assigning jobs to machines to minimize the completion time of the last job. Usually, precedence constraints are given by a partial order on the set of jobs, and each job requires all its…
In the moldable job scheduling problem one has to assign a set of $n$ jobs to $m$ machines, in order to minimize the time it takes to process all jobs. Each job is moldable, so it can be assigned not only to one but any number of the equal…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
There is a long history of approximation schemes for the problem of scheduling jobs on identical machines to minimize the makespan. Such a scheme grants a $(1+\epsilon)$-approximation solution for every $\epsilon > 0$, but the running time…
The active-time scheduling problem considers the problem of scheduling preemptible jobs with windows (release times and deadlines) on a parallel machine that can schedule up to $g$ jobs during each timestep. The goal in the active-time…
In this paper we study the classical problem of throughput maximization. In this problem we have a collection $J$ of $n$ jobs, each having a release time $r_j$, deadline $d_j$, and processing time $p_j$. They have to be scheduled…
We study the problem of preemptive scheduling of n equal-length jobs with given release times on m identical parallel machines. The objective is to minimize the average flow time. Recently, Brucker and Kravchenko proved that the optimal…
As the gap between compute and I/O performance tends to grow, modern High-Performance Computing (HPC) architectures include a new resource type: an intermediate persistent fast memory layer, called burst buffers. This is just one of many…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…