Related papers: Scheduling two types of jobs with minimum makespan
We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m\times n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank…
The non-preemptive job scheduling problem with release times and deadlines on a single machine is fundamental to many scheduling problems. We parameterize this problem by the set of job lengths the jobs can have. The case where all job…
The open shop problem is to find a minimum makespan schedule to process each job $J_i$ on each machine $M_q$ for $p_{iq}$ time such that, at any time, each machine processes at most one job and each job is processed by at most one machine.…
We study shared multi-processor scheduling problem where each job can be executed on its private processor and simultaneously on one of many processors shared by all jobs in order to reduce the job's completion time due to processing time…
The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is…
In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most m_i jobs. M jobs are also given, where job j has a non-negative processing time length t_j >= 0. The task is…
We consider different online algorithms for a generalized scheduling problem for parallel machines, described in details in the first section. This problem is the generalization of the classical parallel machine scheduling problem, when the…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…
Consider a problem in which $n$ jobs that are classified into $k$ types arrive over time at their release times and are to be scheduled on a single machine so as to minimize the maximum flow time. The machine requires a setup taking $s$…
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…
We consider a capacitated job shop problem with order acceptance. This research is motivated by the management of a research and development project pipeline for a company in the agricultural industry whose success depends on regularly…
We consider a scheduling problem where machines need to be rented from the cloud in order to process jobs. There are two types of machines available which can be rented for machine-type dependent prices and for arbitrary durations. However,…
In this paper, we consider the problem of allocating human operator assistance in a system with multiple autonomous robots. Each robot is required to complete independent missions, each defined as a sequence of tasks. While executing a…
We study the problem of scheduling equal-length jobs with release times and deadlines, where the objective is to maximize the number of completed jobs. Preemptions are not allowed. In Graham's notation, the problem is described as…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…
We study the problem of scheduling a set of jobs with release dates, deadlines and processing requirements (or works), on parallel speed-scaled processors so as to minimize the total energy consumption. We consider that both preemption and…
A scheduling method in a robotic network cloud system with minimal makespan is beneficial as the system can complete all the tasks assigned to it in the fastest way. Robotic network cloud systems can be translated into graphs where nodes…