Related papers: Multi-Objective Multi-mode Time-Cost Tradeoff mode…
Software quality estimation is a challenging and time-consuming activity, and models are crucial to face the complexity of such activity on modern software applications. In this context, software refactoring is a crucial activity within…
Algorithms developed for scheduling applications on heterogeneous multiprocessor system focus on asingle objective such as execution time, cost or total data transmission time. However, if more than oneobjective (e.g. execution cost and…
We study a multi-objective scheduling problem on two dedicated processors. The aim is to minimize simultaneously the makespan, the total tardiness and the total completion time. This NP-hard problem requires the use of well-adapted methods.…
The resource constrained multi-mode multi-project scheduling problem (RCMMMPSP) is a notoriously difficult combinatorial optimization problem. For a given set of activities, feasible execution mode assignments and execution starting times…
Software model optimization is the task of automatically generate design alternatives, usually to improve quality aspects of software that are quantifiable, like performance and reliability. In this context, multi-objective optimization…
Software quality estimation is a challenging and time-consuming activity, and models are crucial to face the complexity of such activity on modern software applications. One main challenge is that the improvement of distinctive quality…
Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…
Explicitly accounting for uncertainties is paramount to the safety of engineering structures. Optimization which is often carried out at the early stage of the structural design offers an ideal framework for this task. When the…
Owing to the importance of project cash flow, which comprises an entire history of all cash inflows and cash outflows, to economic survival of firms, it is vital to coping with project scheduling issues considering resource constraints in…
Electric machine design optimization is a computationally expensive multi-objective optimization problem. While the objectives require time-consuming finite element analysis, optimization constraints can often be based on mathematical…
This study presents a hybrid metaheuristic for the resource-constrained project scheduling problem (RCPSP), which integrates a genetic algorithm (GA) and a neighborhood search strategy (NS). The RCPSP consists of a set of activities that…
Geometric programming problems occur frequently in engineering design and management. In multiobjective optimization, the trade-off information between different objective functions is probably the most important piece of information in a…
Architecture optimization is the process of automatically generating design options, typically to enhance software's quantifiable quality attributes, such as performance and reliability. Multi-objective optimization approaches have been…
In recent years, resources with multiple skills have received attention as an extension of the resource-constrained project scheduling problem known as MSRCPSP. Although the disruption rate is well-estimated in today's manufacturing…
In model-predictive control (MPC), achieving the best closed-loop performance under a given computational resource is the underlying design consideration. This paper analyzes the MPC design problem with control performance and required…
Model predictive control (MPC) is a promising approach for the lateral and longitudinal control of autonomous vehicles. However, the parameterization of the MPC with respect to high-level requirements such as passenger comfort as well as…
Multi-mode resource and precedence-constrained project scheduling is a well-known challenging real-world optimisation problem. An important variant of the problem requires scheduling of activities for multiple projects considering…
This paper presents a mixed-integer linear programming formulation for the multi-mode resource-constrained project scheduling problem with uncertain activity durations. We consider a two-stage robust optimisation approach and find solutions…
The Multi-mode Resource Availability Cost Problem (MRACP) optimizes resource availability to minimize usage costs and is a recent project scheduling problem variant. The Multi-Mode On-Site Workshop Availability Cost Problem (MOSWACP)…
We present a multi-objective evolutionary optimization algorithm that uses Gaussian process (GP) regression-based models to select trial solutions in a multi-generation iterative procedure. In each generation, a surrogate model is…