Related papers: Scheduling jobs that change over time
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
We consider the classical machine scheduling, where $n$ jobs need to be scheduled on $m$ machines, and where job $j$ scheduled on machine $i$ contributes $p_{i,j}\in \mathbb{R}$ to the load of machine $i$, with the goal of minimizing the…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
We consider a game-theoretic variant of an interval scheduling problem. Every job is associated with a length, a weight, and a color. Each player controls all the jobs of a specific color, and needs to decide on a processing interval for…
The NP-hard MATERIAL CONSUMPTION SCHEDULING Problem and closely related problems have been thoroughly studied since the 1980's. Roughly speaking, the problem deals with minimizing the makespan when scheduling jobs that consume non-renewable…
We study shared processor scheduling of $\textit{multiprocessor}$ weighted jobs where each job can be executed on its private processor and simultaneously on possibly $\textit{many}$ processors shared by all jobs in order to reduce their…
Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop…
In this paper we consider two problems regarding the scheduling of available personnel in order to perform a given quantity of work, which can be arbitrarily decomposed into a sequence of activities. We are interested in schedules which…
We study the classical scheduling problem of minimizing the makespan of a set of unit size jobs with precedence constraints on parallel identical machines. Research on the problem dates back to the landmark paper by Graham from 1966 who…
Motivated by green manufacturing, this paper investigates a scheduling with rejection problem subject to an energy consumption constraint. Machines are associated with non-uniform energy consumption rates, defined as the energy consumed per…
The paper is concerned with the two-machine flow shop, where each job requires an additional resource (referred to as storage space) from the start of its first operation till the end of its second operation. The storage requirement of a…
We study a single-machine scheduling problem with sequence dependent setup times, motivated by applications in manufacturing and service industries - in particular, the calendering stage in rubber flooring production. In this phase, setup…
We consider the uniform parallel machines scheduling problem in the context of optimistic bilevel optimization, where two speed options are considered. In this scenario, the leader aims to minimize the weighted number of tardy jobs, while…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…
In this paper we study a proportionate flow shop of batching machines with release dates and a fixed number $m \geq 2$ of machines. The scheduling problem has so far barely received any attention in the literature, but recently its…
Algorithms with predictions is a recent framework that has been used to overcome pessimistic worst-case bounds in incomplete information settings. In the context of scheduling, very recent work has leveraged machine-learned predictions to…
In online makespan minimization a sequence of jobs $\sigma = J_1,..., J_n$ has to be scheduled on $m$ identical parallel machines so as to minimize the maximum completion time of any job. We investigate the problem with an essentially new…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
In this paper, we consider the problem of scheduling jobs on parallel identical machines, where the processing times of jobs are uncertain: only interval bounds of processing times are known. The optimality criterion of a schedule is the…
We study the problem of scheduling jobs on fault-prone machines communicating via a shared channel, also known as multiple-access channel. We have $n$ arbitrary length jobs to be scheduled on $m$ identical machines, $f$ of which are prone…