The two-stage stochastic unit commitment problem has become an important tool to support decision-making under uncertainty in power systems. Representing the uncertainty by a large number of scenarios guarantees accurate results but…
In this paper we introduce a continuous time multi stage stochastic optimization for scheduling generating units, their commitment, reserve capacities and their continuous time generation profiles in the day-ahead wholesale electricity…
System operators employ operating reserves to deal with unexpected variations of demand and generation and guarantee the security of supply. However, they face new challenges to ensure this mission with the increasing share of renewable…
Unit maintenance and unit commitment are two critical and interrelated aspects of electric power system operation, both of which face the challenge of coordinating efforts to enhance reliability and economic performance. This challenge…
This paper proposes a reformulation of the scenario-based two-stage unit commitment problem under uncertainty that allows finding unit-commitment plans that perform reasonably well both in expectation and for the worst case realization of…
Optimization models have been broadly used within side the energy industry as useful decision-making systems for scheduling and dispatching electric powered energy resources; this is applied in a system called unit commitment (UC). Unit…
Two-stage stochastic optimization is a framework for modeling uncertainty, where we have a probability distribution over possible realizations of the data, called scenarios, and decisions are taken in two stages: we make first-stage…
Day-ahead scheduling of electricity generation or unit commitment is an important and challenging optimization problem in power systems. Variability in net load arising from the increasing penetration of renewable technologies have…
Due to the established energy production methods contribution to the climate crisis, renewable energy is to replace a substantial part of coal or nuclear plants to prevent greenhouse gases or toxic waste entering the atmosphere. This…
We consider a risk-averse stochastic capacity planning problem under uncertain demand in each period. Using a scenario tree representation of the uncertainty, we formulate a multistage stochastic integer program to adjust the capacity…
This paper deals with the problem of clearing sequential electricity markets under uncertainty. We consider the European approach, where reserves are traded separately from energy to meet exogenous reserve requirements. Recently pro- posed…
In this paper we analyze the effect of two modelling approaches for supply planning problems under uncertainty: two-stage stochastic programming (SP) and robust optimization (RO). The comparison between the two approaches is performed…
Production logistics has an important role as a chain that connects the components of the production system. The most important goal of production logistics plans is to keep the flow of the production system well. However, compared to the…
Multi-stage stochastic programming is a well-established framework for sequential decision making under uncertainty by seeking policies that are fully adapted to the uncertainty. Often such flexible policies are not desirable, and the…
This paper proposes a neural stochastic optimization method for efficiently solving the two-stage stochastic unit commitment (2S-SUC) problem under high-dimensional uncertainty scenarios. The proposed method approximates the second-stage…
We consider a multi-stage stochastic lot-sizing problem with service level constraints and supplier-driven product substitution. A firm has multiple products and it has the option to meet demand from substitutable products at a cost.…
This study investigates a stochastic production planning problem with regime-switching parameters, inspired by economic cycles impacting production and inventory costs. The model considers types of goods and employs a Markov chain to…
Production planning must account for uncertainty in a production system, arising from fluctuating demand forecasts. Therefore, this article focuses on the integration of updated customer demand into the rolling horizon planning cycle. We…
We study the multi-stage stochastic unit commitment problem in which commitment and generation decisions can be made and adjusted in each time period. We formulate this problem as a Markov decision process, which is "weakly-coupled" in the…
This paper addresses a central challenge of jointly considering shorter-term (e.g. hourly) and longer-term (e.g. yearly) uncertainties in power system planning with increasing penetration of renewable and storage resources. In conventional…