Related papers: A Subexponential Time Algorithm for Makespan Sched…
We consider the problem of counting straight-edge triangulations of a given set $P$ of $n$ points in the plane. Until very recently it was not known whether the exact number of triangulations of $P$ can be computed asymptotically faster…
Given a set of $m$ points and a set of $n$ lines in the plane, we consider the problem of computing the faces of the arrangement of the lines that contain at least one point. In this paper, we present an $O(m^{2/3}n^{2/3}+(n+m)\log n)$ time…
We study an interval ordering problem introduced by D\"urr et al. [Discrete Appl. Math. 2012] which is motivated by applications in bioinformatics. The task is to order a given set of n intervals with the goal of minimizing a certain…
Maximum bipartite matching (MBM) is a fundamental problem in combinatorial optimization with a long and rich history. A classic result of Hopcroft and Karp (1973) provides an $O(m \sqrt{n})$-time algorithm for the problem, where $n$ and $m$…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
We revisit the Subset Sum problem over the finite cyclic group $\mathbb{Z}_m$ for some given integer $m$. A series of recent works has provided near-optimal algorithms for this problem under the Strong Exponential Time Hypothesis. Koiliaris…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…
The $1 \mid \mid \Sigma w_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs.…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be…
Makespan minimization on identical machines is a fundamental problem in online scheduling. The goal is to assign a sequence of jobs to $m$ identical parallel machines so as to minimize the maximum completion time of any job. Already in the…
We consider the classical online scheduling problem P||C_{max} in which jobs are released over list and provide a nearly optimal online algorithm. More precisely, an online algorithm whose competitive ratio is at most (1+\epsilon) times…
We consider fundamental scheduling problems motivated by energy issues. In this framework, we are given a set of jobs, each with a release time, deadline and required processing length. The jobs need to be scheduled on a machine so that at…
We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is…
We consider the problem of scheduling on a single processor a given set of n jobs. Each job j has a workload w_j and a release time r_j. The processor can vary its speed and hibernate to reduce energy consumption. In a schedule minimizing…
We consider the classical minimum makespan scheduling problem, where the processing time of job $j$ on machine $i$ is $p_{ij}$, and the matrix $P=(p_{ij})_{m\times n}$ is of a low rank. It is proved in (Bhaskara et al., SODA 2013) that rank…
We consider non-clairvoyant scheduling with online precedence constraints, where an algorithm is oblivious to any job dependencies and learns about a job only if all of its predecessors have been completed. Given strong impossibility…
The aim of power management policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory level of performance. One common method for saving energy is to simply suspend the system during the idle…