Related papers: A Subexponential Time Algorithm for Makespan Sched…
We provide new (parameterized) computational hardness results for Interval Scheduling on Unrelated Machines. It is a classical scheduling problem motivated from just-in-time or lean manufacturing, where the goal is to complete jobs exactly…
Permutation patterns and pattern avoidance have been intensively studied in combinatorics and computer science, going back at least to the seminal work of Knuth on stack-sorting (1968). Perhaps the most natural algorithmic question in this…
In this paper the problem of scheduling of jobs on parallel machines under incompatibility relation is considered. In this model a binary relation between jobs is given and no two jobs that are in the relation can be scheduled on the same…
This paper addresses resource allocation problem with a separable objective function under a single linear constraint, formulated as maximizing $\sum_{j=1}^{n}R_j(x_j)$ subject to $\sum_{j=1}^{n}x_j=k$ and $x_j\in\{0,\dots,m\}$. While…
We study the classic problem of minimizing the expected total completion time of jobs on $m$ identical machines in the setting where the sizes of the jobs are stochastic. Specifically, the size of each job is a random variable whose…
We consider energy-efficient scheduling on multiprocessors, where the speed of each processor can be individually scaled, and a processor consumes power $s^{\alpha}$ when running at speed $s$, for $\alpha>1$. A scheduling algorithm needs to…
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
In this paper we address the constrained longest common subsequence problem. Given two sequences $X$, $Y$ and a constrained sequence $P$, a sequence $Z$ is a constrained longest common subsequence for $X$ and $Y$ with respect to $P$ if $Z$…
This paper studies the growing domain of Robotic Process Automation (RPA) problems. Motivated by scheduling problems arising in RPA, we study the parameterized complexity of the single-machine problem $1|\text{prec},r_j,d_j|*$. We focus on…
Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called…
The Makespan Scheduling problem is an extensively studied NP-hard problem, and its simplest version looks for an allocation approach for a set of jobs with deterministic processing times to two identical machines such that the makespan is…
We study the parameterized complexity of scheduling unit-time jobs on parallel, identical machines under generalized precedence constraints for minimization of the makespan and the sum of completion times. In our setting, each job is…
We study a fundamental online scheduling problem where jobs with processing times, weights, and deadlines arrive online over time at their release dates. The task is to preemptively schedule these jobs on a single or multiple (possibly…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
In the paper we consider the problem of scheduling $n$ identical jobs on 4 uniform machines with speeds $s_1 \geq s_2 \geq s_3 \geq s_4,$ respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are…
We study envy-free mechanisms for scheduling tasks on unrelated machines (agents) that approximately minimize the makespan. For indivisible tasks, we put forward an envy-free poly-time mechanism that approximates the minimal makespan to…
In the Scheduling Machines with Capacity Constraints problem, we are given k identical machines, each of which can process at most m_i jobs. M jobs are also given, where job j has a non-negative processing time length t_j >= 0. The task is…
Given $N$ instances $(X_1,t_1),\ldots,(X_N,t_N)$ of Subset Sum, the AND Subset Sum problem asks to determine whether all of these instances are yes-instances; that is, whether each set of integers $X_i$ has a subset that sums up to the…
In a recent paper, Kuperberg described the first subexponential time algorithm for solving the dihedral hidden subgroup problem. The space requirement of his algorithm is super-polynomial. We describe a modified algorithm whose running time…
Due to its optimality on a single machine for the problem of minimizing average flow time, Shortest-Remaining-Processing-Time (\srpt) appears to be the most natural algorithm to consider for the problem of minimizing average flow time on…