Related papers: IOTA Proton Injector Beamline Installation
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton…
The Integrable Optics Test Accelerator at Fermilab will explore beam dynamics in a ring with intense space-charge using 2.5 MeV proton beams with an incoherent tune shift approaching -0.5. We will use this machine to explore the interplay…
Ionization profile monitors (IPMs) are used in the Fermilab Main Injector (MI) to monitor injection lattice matching by measuring turn-by-turn sigmas at injection and to measure transverse emittance of the beam during the acceleration…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new…
In nuclear and atomic physics experiments, charged ion beams often need to be guided from the ion production to the experimental site. In the PUMA experiment, an ion source beamline was developed, which can be operated with up to…
To maximize the physics potential of future neutrino oscillation experiments, it is proposed to build a 15-MW `proton driver' consisitng solely of a 3-GeV proton injector linac (PI) and a 17-GeV superconducting ILC-type linac (SCL). The…
We are designing and fabricating two new thermionic sources of magnetized electrons for use in the electron lens project in the Integrable Optics Test Accelerator (IOTA) at Fermilab. These electron sources will be used for cooling 2.5 MeV…
The Neutrinos at the Main Injector (NuMI) facility at Fermilab is due to begin operations in late 2004. NuMI will deliver an intense muon neutrino beam of variable energy 2-20 GeV directed into the Earth at 58 mrad for short (~1 km) and…
The next generation of high-energy physics experiments requires high intensity protons in the multi-GeV energy range for efficient production of secondary beams. The Fermilab long-term future requires an 8 GeV proton source to feed the Main…
The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…
We are considering a two-beam accelerator (TBA) scheme with ion or proton beam as a driver. By comparison of the proposed scheme and the one with electron driver, we concluded, that TBA with ion/proton driver beam looks preferable.…
The Main Injector (MI) at Fermilab currently produces high-intensity beams of protons at energies of 120 GeV for a variety of physics experiments. Acceleration of polarized protons in the MI would provide opportunities for a rich spin…
The Main Injector is a new rapid cycling accelerator at Fermilab which is a source of protons to be used in antiproton production to enhance the luminosity of the Tevatron Collider and to provide extracted beams for use in a range of fixed…
We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton…
To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6…
Part-3 of "Project X: Accelerator Reference Design, Physics Opportunities, Broader Impacts". The proposed Project X proton accelerator at Fermilab, with multi-MW beam power and highly versatile beam formatting, will be a unique world-class…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…