English

Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection

Accelerator Physics 2007-05-23 v1

Abstract

To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector / Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period.

Keywords

Cite

@article{arxiv.physics/0407007,
  title  = {Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection},
  author = {R. Zwaska and S. Kopp and W. Pellico and R. Webber},
  journal= {arXiv preprint arXiv:physics/0407007},
  year   = {2007}
}

Comments

Contributed to EPAC 2004; Lucerne, Switzerland

R2 v1 2026-07-22T18:59:51.146Z