The PIP2IT accelerator was assembled in multiple stages in 2014 - 2021 to test concepts and components of the future PIP-II linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA…
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first…
The PIP-II Machine Protection System (MPS) requires a dedicated set of tools for configuration control and management of the machine modes and beam modes of the accelerator. The protection system reacts to signals from various elements of…
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test…
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under…
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised…
The PIP-II project is a program to upgrade the Fermilab accelerator complex. The PIP-II linac includes a 2.1 MeV Medium Energy Beam Transport (MEBT) section that incorporates a unique chopping system to perform arbitrary, bunch-by-bunch…
Fermilab's Superconducting RF Beam Test Facility currently under construction will produce electron beams capable of damaging the acceleration structures and the beam line vacuum chambers in the event of an aberrant accelerator pulse. The…
In Fermilab's PIP-II machine protection system, beam loss signals from various detectors are digitized at 125 MS/s. Noise from both high-frequency sources and low-frequency 60 Hz AC power equipment can contaminate the data. To suppress…
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new…
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long…
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such…
PIP-II is an 800 MeV superconducting RF linear accelerator under development at Fermilab. As the new first stage in our accelerator chain, it will deliver high-power beam to multiple experiments simultaneously and thus drive Fermilab's…
The Fermilab Booster is being upgraded under the Proton Improvement Plan (PIP) to be capable of providing a proton flux of $2.25^{17}$ protons per hour. The intensity per cycle will remain at the present operational $4.3^{12}$ protons per…
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a…
The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW-compatible, pulsed H- superconducting RF linac. To validate the concept of the…
The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the…