The need for larger mK cooling platforms is being driven by the desire to host ever growing numbers of cryogenic qubits in quantum computing platforms. As part of the Superconducting Quantum Materials and Systems Center at Fermilab funded…
A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for…
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three…
A 5-MeV RFQ designed for a proton current up to 100-mA CW is now under construction as part of the High Intensity Proton Injector project (IPHI). Its computed transmission is greater than 99 %. The main goals of the project are to verify…
The period 1980-2000 saw the impressive development of applied superconductivity in high-energy particle accelerators, from single components to long strings of superconducting magnets and high-frequency acceleration cavities. Large and…
Liquid Nitrogen precooling is used in most Cryoplants to achieve cooldown to 80 K temperature range. In one such system at Fermilab's CMTF Superfluid Cryoplant, where the Helium supply directly exchanges heat with liquid Nitrogen, freezing…
A muon collider as well as a neutrino factory requires a large number of muons with a kinetic energy of 50GeV or more. Muon survival demands a high gradient linac. The large transverse and longitudinal emittance of the muon beam coming from…
The superconducting RF linac for LCLS-II calls for 1.3 GHz 9-cell cavities with an average intrinsic quality factor Q0 of 2.7x10^10 at 2 K and 16 MV/m accelerating gradient. Two niobium 9-cell cavities, prepared with nitrogen-doping at…
This paper describes the development progress of high current superconducting RF linacs in Los Alamos, performed to support a design of the linac for the APT (Accelerator Production of Tritium) Project. The APT linac design includes a CW…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT…
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long…
The current program at Fermilab involves the construction of a new superconducting linear accelerator (LINAC) to replace the existing warm version. The new LINAC, together with other planned improvements, is in support of proton beam…
This report describes a concept of an EIC cooling system, based on a proven induction linac technology with a dc electron beam. The system would operate in a full energy range of proton beams (100 - 270 GeV) and would provide 50-100 A…
The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to…
This paper is part of the Prelaunch status LFI papers published on JINST: http://www.iop.org/EJ/journal/-page=extra.proc5/1748-0221 Two continuous closed-cycle hydrogen Joule-Thomson (J-T) sorption coolers have been fabricated and assembled…
For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being…
SPIRAL 2 is a high intensity heavy ions beams accelerator project that has been going on for more than 10 years now. Countless efforts in different disciplines made it what it is today. One of the most important steps after the set up of…
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its…
The peak current limit for the Fermilab Linac was recently studied. The purpose was to learn what components of the present Linac can be used for the first stage of a proposed proton driver[1]. For this application the Linac must provide a…
As part of the PIP-II project at Fermilab, a pre-production cryomodule featuring 325 MHz Single Spoke Resonator type 2 (SSR2) superconducting RF cavities is under construction. These SSR2 cavities are fabricated by industry partners and…