Related papers: A faster exact method for solving the robust multi…

200 papers

This paper considers the resource-constrained project scheduling problem with uncertain activity durations. We assume that activity durations lie in a budgeted uncertainty set, and follow a robust two-stage approach, where a decision maker…

Optimization and Control · Mathematics 2020-04-15 Matthew Bold , Marc Goerigk

Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…

Optimization and Control · Mathematics 2023-11-22 Izack Cohen , Krzysztof Postek , Shimrit Shtern

In this work, we study a single-machine scheduling problem that aims at minimizing the total cost of a schedule subject to start-time dependent costs. This framework naturally captures scenarios where costs fluctuate throughout the day,…

Optimization and Control · Mathematics 2026-04-17 Sofía Rodríguez-Ballesteros , Javier Alcaraz , Laura Anton-Sanchez , Marc Goerigk , Dorothee Henke

This paper reviews compact continuous-time formulations for the multi-mode resource-constrained project scheduling problem. Specifically, we first point out a serious flaw in an existing start-end-event-based formulation owing to…

Discrete Mathematics · Computer Science 2023-02-28 David Sayah

We propose three novel mathematical optimization formulations that solve the same two-type heterogeneous multiprocessor scheduling problem for a real-time taskset with hard constraints. Our formulations are based on a global scheduling…

Distributed, Parallel, and Cluster Computing · Computer Science 2017-10-13 Mason Thammawichai , Eric C. Kerrigan

We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide…

Data Structures and Algorithms · Computer Science 2017-08-11 Maciej Drwal

Multi-stage stochastic programming is a well-established framework for sequential decision making under uncertainty by seeking policies that are fully adapted to the uncertainty. Often such flexible policies are not desirable, and the…

Optimization and Control · Mathematics 2024-08-06 Beste Basciftci , Shabbir Ahmed , Nagi Gebraeel

We investigate the recoverable robust single machine scheduling problem under interval uncertainty. In this setting, jobs have first-stage processing times p and second-stage processing times q and we aim to find a first-stage and…

Data Structures and Algorithms · Computer Science 2022-03-08 Matthew Bold , Marc Goerigk

We consider a combined problem of teaming and scheduling of multi-skilled employees that have to perform jobs with uncertain qualification requirements. We propose two modeling approaches that generate solutions that are robust to possible…

Optimization and Control · Mathematics 2020-11-03 Yulia Anoshkina , Marc Goerigk , Frank Meisel

Decision making needs to take an uncertain environment into account. Over the last decades, robust optimization has emerged as a preeminent method to produce solutions that are immunized against uncertainty. The main focus in robust…

Optimization and Control · Mathematics 2021-02-11 Marc Goerigk , Michael Hartisch

Project scheduling in manufacturing environments often requires flexibility in terms of the selection and the exact length of alternative production activities. Moreover, the simultaneous scheduling of multiple lots is mandatory in many…

Artificial Intelligence · Computer Science 2020-10-26 Viktoria A. Hauder , Andreas Beham , Sebastian Raggl , Sophie N. Parragh , Michael Affenzeller

We study a mutually enriching connection between response time analysis in real-time systems and the mixing set problem. Thereby generalizing over known results we present a new approach to the computation of response times in…

Data Structures and Algorithms · Computer Science 2023-11-02 Max A. Deppert , Klaus Jansen

In recent advances in solving the problem of transmission network expansion planning, the use of robust optimization techniques has been put forward, as an alternative to stochastic mathematical programming methods, to make the problem…

Computational Engineering, Finance, and Science · Computer Science 2016-09-28 Roberto Minguez , Raquel Garcia-Bertrand

Multi-mode resource and precedence-constrained project scheduling is a well-known challenging real-world optimisation problem. An important variant of the problem requires scheduling of activities for multiple projects considering…

Data Structures and Algorithms · Computer Science 2016-09-09 Shahriar Asta , Daniel Karapetyan , Ahmed Kheiri , Ender Özcan , Andrew J. Parkes

The resource constrained multi-mode multi-project scheduling problem (RCMMMPSP) is a notoriously difficult combinatorial optimization problem. For a given set of activities, feasible execution mode assignments and execution starting times…

Artificial Intelligence · Computer Science 2013-10-03 Martin Josef Geiger

We are considering a two-stage optimal scheduling problem, which involves two similar projects with the same starting times for workers and the same deadlines for tasks. It is required that the starting times for workers and deadlines for…

Optimization and Control · Mathematics 2023-01-24 Nikolai Krivulin , Serge\uı Sergeev

We consider robust combinatorial optimization problems where the decision maker can react to a scenario by choosing from a finite set of $k$ solutions. This approach is appropriate for decision problems under uncertainty where the…

Optimization and Control · Mathematics 2019-03-28 André Chassein , Marc Goerigk , Jannis Kurtz , Michael Poss

In this paper, we develop a new formulation of changeover constraints for mixed integer programming problem (MIP) that emerges in solving a short-term production scheduling problem. The new model requires fewer constraints than the original…

Optimization and Control · Mathematics 2014-08-28 Pavel A. Borisovsky , Anton V. Eremeev , Josef Kallrath

There hardly exists a general solver that is efficient for scheduling problems due to their diversity and complexity. In this study, we develop a two-stage framework, in which reinforcement learning (RL) and traditional operations research…

Artificial Intelligence · Computer Science 2021-03-11 Yongming He , Guohua Wu , Yingwu Chen , Witold Pedrycz

This paper presents a profound analysis of the robust job scheduling problem with uncertain release dates on unrelated machines. Our model involves minimizing the worst-case makespan and interval uncertainty where each release date belongs…

Optimization and Control · Mathematics 2021-07-22 Mirosław Ławrynowicz , Jerzy Józefczyk