Minimizing maximum lateness in two-stage projects by tropical optimization

Optimization and Control 2023-01-24 v3 Systems and Control Systems and Control

Abstract

We are considering a two-stage optimal scheduling problem, which involves two similar projects with the same starting times for workers and the same deadlines for tasks. It is required that the starting times for workers and deadlines for tasks should be optimal for the first-stage project and, under this condition, also for the second-stage project. Optimality is measured with respect to the maximal lateness (or maximal delay) of tasks, which has to be minimized. We represent this problem as a problem of tropical pseudoquadratic optimization and show how the existing methods of tropical optimization and tropical linear algebra yield a full and explicit solution for this problem.

Keywords

Cite

@article{arxiv.2108.06425,
  title  = {Minimizing maximum lateness in two-stage projects by tropical optimization},
  author = {Nikolai Krivulin and Serge\uı Sergeev},
  journal= {arXiv preprint arXiv:2108.06425},
  year   = {2023}
}

Comments

29 pages

R2 v1 2026-06-24T05:06:30.451Z