This paper approaches the integrated lot sizing and scheduling problem (ILSSP), in which non-identical machines work in parallel with non-triangular sequence-dependent setup costs and times, setup carry-over and capacity limitation. The aim…
For graphs $G$ and $H$, we say that $G$ is $H$-free if it does not contain $H$ as an induced subgraph. Already in the early 1980s Alekseev observed that if $H$ is connected, then the \textsc{Max Weight Independent Set} problem (MWIS)…
The problem considered is the non-preemptive scheduling of independent jobs that consume a resource (which is non-renewable and replenished regularly) on parallel uniformly related machines. The input defines the speed of machines, size of…
Scheduling is a key decision-making process to improve the performance of flexible manufacturing systems. Place-timed Petri nets provide a formal method for graphically modeling and analyzing such systems. By generating reachability graphs…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
This paper considers the problem of scheduling a single batch processing machine such that the total number of tardy jobs is minimized. The machine can simultaneously process several jobs as a batch as long as the machine capacity is not…
We consider the classic budgeted maximum weight independent set (BMWIS) problem. The input is a graph $G = (V,E)$, a weight function $w:V \rightarrow \mathbb{R}_{\geq 0}$, a cost function $c:V \rightarrow \mathbb{R}_{\geq 0}$, and a budget…
While Artificial intelligence (AI), including Generative AI, are effective at generating high-quality traffic data and optimization solutions in intelligent transportation systems (ITSs), these techniques often demand significant training…
In wireless multi-hop networks, delay is an important metric for many applications. However, the max-weight scheduling algorithms in the literature typically focus on instantaneous optimality, in which the schedule is selected by solving a…
The considered problem is how to optimally allocate a set of jobs to technicians of different skills such that the number of technicians of each skill does not exceed the number of persons with that skill designation. The key motivation is…
We study a fundamental problem called Minimum Length Link Scheduling (MLLS) which is crucial to the efficient operations of wireless networks. Given a set of communication links of arbitrary length spread and assume each link has one unit…
In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests…
The Job Shop Scheduling Problem (JSSP) is a well-known optimization problem in manufacturing, where the goal is to determine the optimal sequence of jobs across different machines to minimize a given objective. In this work, we focus on…
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
Real-life parallel machine scheduling problems can be characterized by: (i) limited information about the exact task duration at scheduling time, and (ii) an opportunity to reschedule the remaining tasks each time a task processing is…
The maximum independent set problem is one of the most important problems in graph algorithms and has been extensively studied in the line of research on the worst-case analysis of exact algorithms for NP-hard problems. In the weighted…
We consider the problem of minimizing the makespan on batch processing identical machines, subject to compatibility constraints, where two jobs are compatible if they can be processed simultaneously in a same batch. These constraints are…
We consider the class of single machine scheduling problems with the objective to minimize the weighted number of late jobs, under the assumption that completion due-dates are not known precisely at the time when decision-maker must provide…
We present a simple distributed $\Delta$-approximation algorithm for maximum weight independent set (MaxIS) in the $\mathsf{CONGEST}$ model which completes in $O(\texttt{MIS}(G)\cdot \log W)$ rounds, where $\Delta$ is the maximum degree,…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…