Related papers: Scheduling Lower Bounds via AND Subset Sum

200 papers

We investigate the approximation for computing the sum $a_1+...+a_n$ with an input of a list of nonnegative elements $a_1,..., a_n$. If all elements are in the range $[0,1]$, there is a randomized algorithm that can compute an…

Data Structures and Algorithms · Computer Science 2012-03-01 Bin Fu , Wenfeng Li , Zhiyong Peng

We study the classical problem of minimizing the total weighted completion time on a fixed set of $m$ identical machines working in parallel, the $Pm||\sum w_jC_j$ problem in the standard three field notation for scheduling problems. This…

Data Structures and Algorithms · Computer Science 2025-02-20 Danny Hermelin , Tomohiro Koana , Dvir Shabtay

The subset sum problem (SSP) can be briefly stated as: given a target integer $E$ and a set $A$ containing $n$ positive integer $a_j$, find a subset of $A$ summing to $E$. The \textit{density} $d$ of an SSP instance is defined by the ratio…

Data Structures and Algorithms · Computer Science 2008-06-23 Changlin Wan , Zhongzhi Shi

We revisit the Subset Sum problem over the finite cyclic group $\mathbb{Z}_m$ for some given integer $m$. A series of recent works has provided near-optimal algorithms for this problem under the Strong Exponential Time Hypothesis. Koiliaris…

Data Structures and Algorithms · Computer Science 2020-11-02 Kyriakos Axiotis , Arturs Backurs , Karl Bringmann , Ce Jin , Vasileios Nakos , Christos Tzamos , Hongxun Wu

In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto…

Data Structures and Algorithms · Computer Science 2017-08-18 Imed Kacem , Hans Kellerer

Given $n$ jobs with processing times $p_1,\dotsc,p_n\in\mathbb N$ and $m\le n$ machines with speeds $s_1,\dotsc,s_m\in\mathbb N$ our goal is to allocate the jobs to machines minimizing the makespan. We present an algorithm that solves the…

Data Structures and Algorithms · Computer Science 2025-01-10 Lars Rohwedder

The $1|B,r_j|\sum w_jU_j$ scheduling problem takes as input a batch setup time $\Delta$ and a set of $n$ jobs, each having a processing time, a release date, a weight, and a due date; the task is to find a sequence of batches that minimizes…

Data Structures and Algorithms · Computer Science 2019-11-28 Danny Hermelin , Matthias Mnich , Simon Omlor

We consider the classical makespan minimization scheduling problem where $n$ jobs must be scheduled on $m$ identical machines. Using weighted random sampling, we developed two sublinear time approximation schemes: one for the case where $n$…

Data Structures and Algorithms · Computer Science 2026-05-05 Bin Fu , Yumei Huo , Hairong Zhao

We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…

Data Structures and Algorithms · Computer Science 2012-12-11 Frans Schalekamp , Rene Sitters , Suzanne van der Ster , Leen Stougie , Victor Verdugo , Anke van Zuylen

The Min-sum single machine scheduling problem (denoted 1||sum f_j) generalizes a large number of sequencing problems. The first constant approximation guarantees have been obtained only recently and are based on natural time-indexed LP…

Data Structures and Algorithms · Computer Science 2015-11-30 Adam Kurpisz , Samuli Leppänen , Monaldo Mastrolilli

The paper considers scheduling on parallel machines under the constraint that some pairs of jobs cannot be processed concurrently. Each job has an associated weight, and all jobs have the same deadline. The objective is to maximise the…

Data Structures and Algorithms · Computer Science 2021-06-15 Yakov Zinder , Joanna Berlińska , Charlie Peter

We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…

Data Structures and Algorithms · Computer Science 2022-11-23 Rajmohan Rajaraman , David Stalfa , Sheng Yang

We show a close connection between structural hardness for $k$-partite graphs and tight inapproximability results for scheduling problems with precedence constraints. Assuming a natural but nontrivial generalisation of the bipartite…

Computational Complexity · Computer Science 2015-07-08 Abbas Bazzi , Ashkan Norouzi-Fard

In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…

Computational Complexity · Computer Science 2019-07-09 Marten Maack , Klaus Jansen

The bin packing problem is to find the minimum number of bins of size one to pack a list of items with sizes $a_1,..., a_n$ in $(0,1]$. Using uniform sampling, which selects a random element from the input list each time, we develop a…

Computational Complexity · Computer Science 2011-02-25 Richard Beigel , Bin Fu

An optimal solution to the problem of scheduling real-time tasks on a set of identical processors is derived. The described approach is based on solving an equivalent uniprocessor real-time scheduling problem. Although there are other…

Operating Systems · Computer Science 2011-04-19 Paul Regnier , George Lima , Ernesto Massa

While previous work on energy-efficient algorithms focused on assumption that tasks can be assigned to any processor, we initially study the problem of task scheduling on restricted parallel processors. The objective is to minimize the…

Data Structures and Algorithms · Computer Science 2013-09-17 Xibo Jin , Fa Zhang , Ying Song , Liya Fan , Zhiyong Liu

Warehouses are nowadays the scene of complex logistic problems integrating different decision layers. This paper addresses the Joint Order Batching, Picker Routing and Sequencing Problem with Deadlines (JOBPRSP-D) in rectangular warehouses.…

Optimization and Control · Mathematics 2023-07-04 Olivier Briant , Hadrien Cambazard , Diego Cattaruzza , Nicolas Catusse , Anne-Laure Ladier , Maxime Ogier

We consider the problem of scheduling $n$ jobs to minimize the makespan on $m$ unrelated machines, where job $j$ requires time $p_{ij}$ if processed on machine $i$. A classic algorithm of Lenstra et al. yields the best known approximation…

Data Structures and Algorithms · Computer Science 2014-06-24 Dor Arad , Yael Mordechai , Hadas Shachnai

We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…

Data Structures and Algorithms · Computer Science 2020-04-22 Sami Davies , Janardhan Kulkarni , Thomas Rothvoss , Jakub Tarnawski , Yihao Zhang