Related papers: Scheduling Lower Bounds via AND Subset Sum
This paper addresses the problem of scheduling a set of jobs that are released over the time on a set of identical parallel machines, aiming at the minimization of the total weighted completion time. This problem, referred to as $P|r_j|\sum…
The Subset Sum problem is a classical NP-complete problem with a long-standing $O^*(2^{n/2})$ deterministic bound due to Horowitz and Sahni. We present results at two distinct levels of generality. First (instance-sensitive bound), we…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints, and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. Using the standard…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
Scheduling problems are fundamental in combinatorial optimization. Much work has been done on approximation algorithms for NP-hard cases, but relatively little is known about exact solutions when some part of the input is a fixed parameter.…
We study a fundamental online scheduling problem where jobs with processing times, weights, and deadlines arrive online over time at their release dates. The task is to preemptively schedule these jobs on a single or multiple (possibly…
In this paper we study the classical problem of throughput maximization. In this problem we have a collection $J$ of $n$ jobs, each having a release time $r_j$, deadline $d_j$, and processing time $p_j$. They have to be scheduled…
Unbounded SubsetSum is a classical textbook problem: given integers $w_1,w_2,\cdots,w_n\in [1,u],~c,u$, we need to find if there exists $m_1,m_2,\cdots,m_n\in \mathbb{N}$ satisfying $c=\sum_{i=1}^n w_im_i$. In its all-target version, $t\in…
We present algorithms for length-constrained maximum sum segment and maximum density segment problems, in particular, and the problem of finding length-constrained heaviest segments, in general, for a sequence of real numbers. Given a…
Given n positive integers, the Modular Subset Sum problem asks if a subset adds up to a given target t modulo a given integer m. This is a natural generalization of the Subset Sum problem (where m=+\infty) with ties to additive…
We consider the $\mathcal{NP}$-hard problem $\mathrm{P} \mathbf{\vert} \mathrm{pmtn, setup=s_i} \mathbf{\vert} \mathrm{C_{\max}}$, the problem of scheduling $n$ jobs, which are divided into $c$ classes, on $m$ identical parallel machines…
Subset Sum Ratio is the following optimization problem: Given a set of $n$ positive numbers $I$, find disjoint subsets $X,Y \subseteq I$ minimizing the ratio $\max\{\Sigma(X)/\Sigma(Y),\Sigma(Y)/\Sigma(X)\}$, where $\Sigma(Z)$ denotes the…
Subset-Sum is an NP-complete problem where one must decide if a multiset of $n$ integers contains a subset whose elements sum to a target value $m$. The best-known classical and quantum algorithms run in time $\tilde{O}(2^{n/2})$ and…
Distributed computing systems often need to consider the scheduling problem involving a collection of highly dependent data-processing tasks that must work in concert to achieve mission-critical objectives. This paper considers the…
We study a broad class of algorithmic problems with an "additive flavor" such as computing sumsets, 3SUM, Subset Sum and geometric pattern matching. Our starting point is that these problems can often be solved efficiently for integers,…
In the field of algorithmic analysis, one of the more well-known exercises is the subset sum problem. That is, given a set of integers, determine whether one or more integers in the set can sum to a target value. Aside from the brute-force…
The n-way number partitioning problem, a fundamental challenge in combinatorial optimization, has significant implications for applications such as fair division and machine scheduling. Despite these problems being NP-hard, many…
Machine scheduling problems involving conflict jobs can be seen as a constrained version of the classical scheduling problem, in which some jobs are conflict in the sense that they cannot be proceeded simultaneously on different machines.…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
This paper presents different methods for solving parallel machine scheduling problems with precedence constraints and setup times between the jobs. Limited discrepancy search methods mixed with local search principles, dominance conditions…