Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM). EDM provides an estimation of deviations in schedule and a final project…
The aim of this paper is to describe a new an integrated methodology for project control under uncertainty. This proposal is based on Earned Value Methodology and risk analysis and presents several refinements to previous methodologies.…
Most statistical process control programmes in healthcare focus on surveillance of outcomes at the final stage of a procedure, such as mortality or failure rates. Such an approach ignores the multi-stage nature of these procedures, in which…
This paper exploits the Duration-of-Use of the demand patterns as a key concept for dealing with demand side flexibility. Starting from the consideration that fine-grained energy metering is not used at the point of supply of the…
To use control charts in practice, the in-control state usually has to be estimated. This estimation has a detrimental effect on the performance of control charts, which is often measured for example by the false alarm probability or the…
A scope in quality control, which has recently received a great deal of attention is profile that characterizes the quality of a product or process by a relationship between two or more variables. In this paper, we propose an EWMA chart for…
A multivariate dispersion control chart monitors changes in the process variability of multiple correlated quality characteristics. In this article, we investigate and compare the performance of charts designed to monitor variability based…
Many extensions and modifications have been made to standard process monitoring methods such as the exponentially weighted moving average (EWMA) chart and the cumulative sum (CUSUM) chart. In addition, new schemes have been proposed based…
In statistical process control Weibull distribution can be used to model the time between events or failures (TBE) in a process with increasing decreasing or constant failure rates. Specifically it helps in monitoring processes where the…
Accurate forecasts of macroeconomic and financial data, such as GDP, CPI, unemployment rates, and stock indices, are crucial for the success of countries, businesses, and investors, resulting in a constant demand for reliable forecasting…
In recent years, the monitoring of compositional data using control charts has been investigated in the Statistical Process Control field. In this study, we will design a Phase II Multivariate Exponentially Weighted Moving Average (MEWMA)…
In practice, there are processes where the in-control mean and standard deviation of a quality characteristic is not stable. In such cases, the coefficient of variation (CV) is a more appropriate measure for assessing process stability. In…
Monitoring a process over time is so important in manufacturing processes to reduce the waste of money and time. Some charts as Shewhart, CUSUM, and EWMA are common to monitor a process with a single intended attribute which is used in…
A wide range of approaches for batch processes monitoring can be found in the literature. This kind of process generates a very peculiar data structure, in which successive measurements of many process variables in each batch run are…
Monitoring binomial proportions across multiple independent streams is a critical challenge in Statistical Process Control (SPC), with applications from manufacturing to cybersecurity. While EWMA charts offer sensitivity to small shifts,…
In this work, we study the performance of two-sided EWMA charts for monitoring double bounded processes using individual observations. Specifically, the term double bounded refers to observations in the interval (0, 1) and thus, these…
In this paper we present a new approach to control variates for improving computational efficiency of Ensemble Monte Carlo. We present the approach using simulation of paths of a time-dependent nonlinear stochastic equation. The core idea…
The monitoring of serially independent or autocorrelated count processes is considered, having a Poisson or (negative) binomial marginal distribution under in-control conditions. Utilizing the corresponding Stein identities, exponentially…
Conversion rate (CVR) prediction is one of the most critical tasks for digital display advertising. Commercial systems often require to update models in an online learning manner to catch up with the evolving data distribution. However,…
Improving the controllability of power networks is crucial as they are highly complex networks operating in synchrony; even minor perturbations can cause desynchronization and instability. To that end, one needs to assess the criticality of…