Related papers: Near-Linear Approximation Algorithms for Schedulin…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
Resource Constrained Project Scheduling Problems (RCPSPs) without preemption are well-known NP-hard combinatorial optimization problems. A feasible RCPSP solution consists of a time-ordered schedule of jobs with corresponding execution…
We present a new framework for designing nonpreemptive and job-size oblivious scheduling policies in the multiserver-job queueing model. The main requirement is to identify a static and balanced sub-partition of the server set and ensure…
We provide polynomial-time approximately optimal Bayesian mechanisms for makespan minimization on unrelated machines as well as for max-min fair allocations of indivisible goods, with approximation factors of $2$ and $\min\{m-k+1,…
We consider the stochastic scheduling problem of minimizing the expected makespan on $m$ parallel identical machines. While the (adaptive) list scheduling policy achieves an approximation ratio of $2$, any (non-adaptive) fixed assignment…
We propose a Boolean Linear Programming model for the preemptive single machine scheduling problem with equal processing times, arbitrary release dates and weights(priorities) minimizing the total weighted completion time. Almost always an…
We study classical deadline-based preemptive scheduling of tasks in a computing environment equipped with both dynamic speed scaling and sleep state capabilities: Each task is specified by a release time, a deadline and a processing volume,…
Modern computing workloads are often composed of parallelizable jobs. A parallelizable job can be completed more quickly when run on additional servers. However, each job can only use a limited number of servers, known as its…
In this paper, we proposed an effective approach for scheduling of multiprocessor unit time tasks with chain precedence on to large multiprocessor system. The proposed longest chain maximum processor scheduling algorithm is proved to be…
We consider the problem of solving integer programs of the form $\min \{\,c^\intercal x\ \colon\ Ax=b, x\geq 0\}$, where $A$ is a multistage stochastic matrix in the following sense: the primal treedepth of $A$ is bounded by a parameter…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
We consider the Pm || Cmax scheduling problem where the goal is to schedule n jobs on m identical parallel machines to minimize makespan. We revisit the famous Longest Processing Time (LPT) rule proposed by Graham in 1969. LPT requires to…
In this paper, we design the first streaming algorithms for the problem of multitasking scheduling on parallel machines with shared processing. In one pass, our streaming approximation schemes can provide an approximate value of the optimal…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have…
We study the classic problem of minimizing the expected total completion time of jobs on $m$ identical machines in the setting where the sizes of the jobs are stochastic. Specifically, the size of each job is a random variable whose…
We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than $1.5$…
We study the fundamental scheduling problem $1\|\sum p_jU_j$. Given a set of $n$ jobs with processing times $p_j$ and deadlines $d_j$, the problem is to select a subset of jobs such that the total processing time is maximized without…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
Parameterizing by the largest processing time $p_{max}$ and the number of different job processing times $d$, we propose a proximity technique for High-Multiplicity Scheduling on Uniform Machines for the objectives Makespan Minimization…
In this paper we consider the coupled task scheduling problem with exact delay times on a single machine with the objective of minimizing the total completion time of the jobs. We provide constant-factor approximation algorithms for several…