We consider the following shared-resource scheduling problem: Given a set of jobs $J$, for each $j\in J$ we must schedule a job-specific processing volume of $v_j>0$. A total resource of $1$ is available at any time. Jobs have a resource…
The NP-hard scheduling problem P||C_max encompasses a set of tasks with known execution time which must be mapped to a set of identical machines such that the overall completion time is minimized. In this work, we improve existing…
We consider a natural scheduling problem which arises in many distributed computing frameworks. Jobs with diverse resource requirements (e.g. memory requirements) arrive over time and must be served by a cluster of servers, each with a…
Bender et al. (SPAA 2013) have proposed a theoretical framework for testing in contexts where safety mistakes must be avoided. Testing in such a context is made by machines that need to be often calibrated. Given that calibration costs, it…
We consider non-preemptive scheduling of MapReduce jobs with multiple tasks in the practical scenario where each job requires several map-reduce rounds. We seek to minimize the average weighted completion time and consider scheduling on…
Many problems are NP-hard and, unless P = NP, do not admit polynomial-time exact algorithms. The fastest known exact algorithms exactly usually take time exponential in the input size. Much research effort has gone into obtaining faster…
Integer linear programs of configurations, or configuration IPs, are a classical tool in the design of algorithms for scheduling and packing problems, where a set of items has to be placed in multiple target locations. Herein a…
In the Demand Strip Packing problem (DSP), we are given a time interval and a collection of tasks, each characterized by a processing time and a demand for a given resource (such as electricity, computational power, etc.). A feasible…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
We revisit a classical scheduling model to incorporate modern trends in data center networks and cloud services. Addressing some key challenges in the allocation of shared resources to user requests (jobs) in such settings, we consider the…
In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
This paper investigates co-scheduling algorithms for processing a set of parallel applications. Instead of executing each application one by one, using a maximum degree of parallelism for each of them, we aim at scheduling several…
In this paper we challenge the widely accepted premise that, in order to carry out a distributed computation, say on the cloud, users have to inform, along with all the inputs that the algorithm in use requires, the number of processors to…
This paper derives polynomial-time approximation schemes for several NP-hard stochastic optimization problems from the algorithmic mechanism design and operations research literatures. The problems we consider involve a principal or seller…
We study a problem related to submodular function optimization and the exact matching problem for which we show a rather peculiar status: its natural LP-relaxation can have fractional optimal vertices, but there is always also an optimal…
We study a sequential resource allocation problem involving a fixed number of recurring jobs. At each time-step the manager should distribute available resources among the jobs in order to maximise the expected number of completed jobs.…
We study a class of combinatorial scheduling problems characterized by a particular type of constraint often associated with electrical power or gas energy. This constraint appears in several practical applications and is expressed as a sum…
We extend the concept of polynomial time approximation algorithms to apply to problems for hierarchically specified graphs, many of which are PSPACE-complete. Assuming P != PSPACE, the existence or nonexistence of such efficient…
We study the problem of scheduling a set of jobs with release dates, deadlines and processing requirements (or works), on parallel speed-scaled processors so as to minimize the total energy consumption. We consider that both preemption and…
This work addresses the problem of exact schedulability assessment in uniprocessor mixed-criticality real-time systems with sporadic task sets. We model the problem by means of a finite automaton that has to be explored in order to check…