Related papers: Packing Sporadic Real-Time Tasks on Identical Mult…
The Replenishment Storage problem (RSP) is to minimize the storage capacity requirement for a deterministic demand, multi-item inventory system where each item has a given reorder size and cycle length. The reorders can only take place at…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
Scheduling of constrained deadline sporadic task systems on multiprocessor platforms is an area which has received much attention in the recent past. It is widely believed that finding an optimal scheduler is hard, and therefore most…
Algorithms based on semi-partitioned scheduling have been proposed as a viable alternative between the two extreme ones based on global and partitioned scheduling. In particular, allowing migration to occur only for few tasks which cannot…
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing…
We are given a set of $n$ jobs that have to be executed on a set of $m$ speed-scalable machines that can vary their speeds dynamically using the energy model introduced in [Yao et al., FOCS'95]. Every job $j$ is characterized by its release…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
Strategies that artificially tighten high-criticality task deadlines in low-criticality behaviors have been successfully employed for scheduling mixed-criticality systems. Although efficient scheduling algorithms have been developed for…
We introduce and study a discrete multi-period extension of the classical knapsack problem, dubbed generalized incremental knapsack. In this setting, we are given a set of $n$ items, each associated with a non-negative weight, and $T$ time…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
In this paper we consider the open shop scheduling problem where the jobs have delivery times. The minimization criterion is the maximum lateness of the jobs. This problem is known to be NP-hard, even restricted to only 2 machines. We…
First, we study geometric variants of the standard set cover motivated by assignment of directional antenna and shipping with deadlines, providing the first known polynomial-time exact solutions. Next, we consider the following general…
In some important application areas of hard real-time systems, preemptive sporadic tasks with harmonic periods and constraint deadlines running upon a uni-processor platform play an important role. We propose a new algorithm for determining…
We give the first algorithm for testing the feasibility of a system of sporadic real-time tasks on a set of identical processors, solving one major open problem in the area of multiprocessor real-time scheduling [S.K. Baruah and K. Pruhs,…
A moldable job is a job that can be executed on an arbitrary number of processors, and whose processing time depends on the number of processors allotted to it. A moldable job is monotone if its work doesn't decrease for an increasing…
The Windows Scheduling Problem, also known as the Pinwheel Problem, is to schedule periodic jobs subject to their processing frequency demands. Instances are given as a set of jobs that have to be processed infinitely often such that the…
This paper considers the problem of scheduling jobs on single and parallel machines where all the jobs possess different processing times but a common due date. There is a penalty involved with each job if it is processed earlier or later…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…
In the unsplittable flow problem on a path, we are given a capacitated path $P$ and $n$ tasks, each task having a demand, a profit, and start and end vertices. The goal is to compute a maximum profit set of tasks, such that for each edge…
In the weighted flow-time problem on a single machine, we are given a set of n jobs, where each job has a processing requirement p_j, release date r_j and weight w_j. The goal is to find a preemptive schedule which minimizes the sum of…