Related papers: An EPTAS for Scheduling on Unrelated Machines of F…
A very well-known machine model in scheduling allows the machines to be unrelated, modelling jobs that might have different characteristics on each machine. Due to its generality, many optimization problems of this form are very difficult…
We study classic scheduling problems on uniformly related machines. Efficient polynomial time approximation schemes (EPTAS's) are fast and practical approximation schemes. New methods and techniques are essential in developing such improved…
In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the…
We consider basic problems of non-preemptive scheduling on uniformly related machines. For a given schedule, defined by a partition of the jobs into m subsets corresponding to the m machines, C_i denotes the completion time of machine i.…
Various new scheduling problems have been arising from practical production processes and spawning new research areas in the scheduling field. We study the parallel multi-stage open shops problem, which generalizes the classic open shop…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
We consider a general load balancing problem on parallel machines. Our machine environment in particular generalizes the standard models of identical machines, and the model of uniformly related machines, as well as machines with a constant…
We consider the classical scheduling problem on parallel identical machines to minimize the makespan, and achieve the following results under the Exponential Time Hypothesis (ETH) 1. The scheduling problem on a constant number $m$ of…
We consider the problem of scheduling $n$ jobs on $m$ uniform machines while minimizing the makespan ($Q||C_{\max}$) and maximizing the minimum completion time ($Q||C_{\min}$) in an online setting with migration of jobs. In this online…
We study approximation algorithms for the problem of minimizing the makespan on a set of machines with uncertainty on the processing times of jobs. In the model we consider, which goes back to~\cite{BertsimasS03}, once the schedule is…
The problem of scheduling jobs on parallel machines (identical, uniform, or unrelated), under incompatibility relation modeled as a block graph, under the makespan optimality criterion, is considered in this paper. No two jobs that are in…
The problem considered is the non-preemptive scheduling of independent jobs that consume a resource (which is non-renewable and replenished regularly) on parallel uniformly related machines. The input defines the speed of machines, size of…
We consider the non-preemptive scheduling problem on identical machines where there is a parameter B and each machine in every unit length time interval can process up to B different jobs. The goal function we consider is the makespan…
We study scheduling problems on a machine with varying speed. Assuming a known speed function we ask for a cost-efficient scheduling solution. Our main result is a PTAS for minimizing the total weighted completion time in this setting. This…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
Makespan scheduling on identical machines is one of the most basic and fundamental packing problems studied in the discrete optimization literature. It asks for an assignment of $n$ jobs to a set of $m$ identical machines that minimizes the…
We consider a natural generalization of classical scheduling problems in which using a time unit for processing a job causes some time-dependent cost which must be paid in addition to the standard scheduling cost. We study the scheduling…
Parallel machine scheduling has been extensively studied in the past decades, with applications ranging from production planning to job processing in large computing clusters. In this work we study some of these fundamental optimization…
We study bicriteria versions of Makespan Minimization on Unrelated Machines and Santa Claus by allowing a constrained number of rejections. Given an instance of Makespan Minimization on Unrelated Machines where the optimal makespan for…