Related papers: A fixed-parameter algorithm for a routing open sho…
In the Disjoint Shortest Paths problem one is given a graph $G$ and a set $\mathcal{T}=\{(s_1,t_1),\dots,(s_k,t_k)\}$ of $k$ vertex pairs. The question is whether there exist vertex-disjoint paths $P_1,\dots,P_k$ in $G$ so that each $P_i$…
In several important routing contexts it is required to identify a set of routes, each of which optimizes a different criterion. For instance, in the context of vehicle routing, one route would minimize the total distance traveled, while…
Consider a problem in which $n$ jobs that are classified into $k$ types arrive over time at their release times and are to be scheduled on a single machine so as to minimize the maximum flow time. The machine requires a setup taking $s$…
We consider the following general scheduling problem studied recently by Moseley. There are $n$ jobs, all released at time $0$, where job $j$ has size $p_j$ and an associated arbitrary non-decreasing cost function $f_j$ of its completion…
We show that, for any graph optimization problem in which the feasible solutions can be expressed by a formula in monadic second-order logic describing sets of vertices or edges and in which the goal is to minimize the sum of the weights in…
The Makespan Scheduling problem is an extensively studied NP-hard problem, and its simplest version looks for an allocation approach for a set of jobs with deterministic processing times to two identical machines such that the makespan is…
The replacement paths problem for directed graphs is to find for given nodes s and t and every edge e on the shortest path between them, the shortest path between s and t which avoids e. For unweighted directed graphs on n vertices, the…
The problem of finding multiple simple shortest paths in a weighted directed graph $G=(V,E)$ has many applications, and is considerably more difficult than the corresponding problem when cycles are allowed in the paths. Even for a single…
Given an undirected, unweighted graph with $n$ vertices and $m$ edges, the maximum cut problem is to find a partition of the $n$ vertices into disjoint subsets $V_1$ and $V_2$ such that the number of edges between them is as large as…
The problem of scheduling jobs and choosing their respective speeds with multiple servers under a sum power constraint to minimize the flow time + energy is considered. This problem is a generalization of the flow time minimization problem…
We consider scheduling problems for unit jobs with release times, where the number or size of the gaps in the schedule is taken into consideration, either in the objective function or as a constraint. Except for a few papers on energy…
This paper addresses the flexible job shop scheduling problem with sequencing flexibility and position-based learning effect. In this variant of the flexible job shop scheduling problem, precedence constraints of the operations constituting…
Given an undirected, weighted graph, with $n$ vertices and $m$ edges, and two special vertices $s$ and $t$, the problem is to find the shortest path between them. We give two bounded-error quantum algorithms with improved runtime in the…
We introduce a novel multivariate approach for solving weighted parameterized problems. In our model, given an instance of size $n$ of a minimization (maximization) problem, and a parameter $W \geq 1$, we seek a solution of weight at most…
Given a set P of n points in the plane, the unit-disk graph G_{r}(P) with respect to a parameter r is an undirected graph whose vertex set is P such that an edge connects two points p, q \in P if the Euclidean distance between p and q is at…
In this paper we study a multi-robot path planning problem for persistent monitoring of an environment. We represent the areas to be monitored as the vertices of a weighted graph. For each vertex, there is a constraint on the maximum time…
Onsite Job Scheduling is a specialized variant of Vehicle Routing Problem (VRP) with multiple depots. The objective of this problem is to execute jobs requested by customers, belonging to different geographic locations by a limited number…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
An algorithm observes the trajectories of random walks over an unknown graph $G$, starting from the same vertex $x$, as well as the degrees along the trajectories. For all finite connected graphs, one can estimate the number of edges $m$ up…
We consider the Pm || Cmax scheduling problem where the goal is to schedule n jobs on m identical parallel machines to minimize makespan. We revisit the famous Longest Processing Time (LPT) rule proposed by Graham in 1969. LPT requires to…