Related papers: A fixed-parameter algorithm for a routing open sho…
We consider the problem of minimizing the makespan on batch processing identical machines, subject to compatibility constraints, where two jobs are compatible if they can be processed simultaneously in a same batch. These constraints are…
The generalized traveling salesman problem (GTSP) is an extension of the well-known traveling salesman problem. In GTSP, we are given a partition of cities into groups and we are required to find a minimum length tour that includes exactly…
We consider the problem of scheduling on a single processor a given set of n jobs. Each job j has a workload w_j and a release time r_j. The processor can vary its speed and hibernate to reduce energy consumption. In a schedule minimizing…
A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flow-shop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been…
We study ordinal makespan scheduling on small numbers of identical machines, with respect to two parallel solutions. In ordinal scheduling, it is known that jobs are sorted by non-increasing sizes, but the specific sizes are not known in…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
In this paper, we study a set of combinatorial optimization problems on weighted graphs: the shortest path problem with negative weights, the weighted perfect bipartite matching problem, the unit-capacity minimum-cost maximum flow problem…
A prominent problem in scheduling theory is the weighted flow time problem on one machine. We are given a machine and a set of jobs, each of them characterized by a processing time, a release time, and a weight. The goal is to find a…
Recently we presented the first algorithm for maintaining the set of nodes reachable from a source node in a directed graph that is modified by edge deletions with $o(mn)$ total update time, where $m$ is the number of edges and $n$ is the…
In this paper, we consider the online version of the machine minimization problem (introduced by Chuzhoy et al., FOCS 2004), where the goal is to schedule a set of jobs with release times, deadlines, and processing lengths on a minimum…
We consider an online scheduling problem, motivated by the issues present at the joints of networks using ATM and TCP/IP. Namely, IP packets have to broken down to small ATM cells and sent out before their deadlines, but cells corresponding…
A weighted point-availability time-dependent network is a list of temporal edges, where each temporal edge has an appearing time value, a travel time value, and a cost value. In this paper we consider the single source Pareto problem in…
Flowshop machine scheduling has been of main interest in several applications where the timing of its processes plays a fundamental role in the utilization of system resources. Addressing the optimal sequencing of the jobs when equivalent…
We present and analyze a wait-free deterministic algorithm for solving the at-most-once problem: how m shared-memory fail-prone processes perform asynchronously n jobs at most once. Our algorithmic strategy provides for the first time…
Given a set of $m$ points and a set of $n$ lines in the plane, we consider the problem of computing the faces of the arrangement of the lines that contain at least one point. In this paper, we present an $O(m^{2/3}n^{2/3}+(n+m)\log n)$ time…
We consider the classic problem of scheduling a set of n jobs non-preemptively on a single machine. Each job j has non-negative processing time, weight, and deadline, and a feasible schedule needs to be consistent with chain-like precedence…
We are given a set of $n$ jobs and a single processor that can vary its speed dynamically. Each job $J_j$ is characterized by its processing requirement (work) $p_j$, its release date $r_j$ and its deadline $d_j$. We are also given a budget…
In this paper, we show that given a weighted, directed planar graph $G$, and any $\epsilon >0$, there exists a polynomial time and $O(n^{\frac{1}{2}+\epsilon})$ space algorithm that computes the shortest path between two fixed vertices in…
This paper presents a scalable solution with adjustable computation time for the joint problem of scheduling and assigning machines and transporters for missions that must be completed in a fixed order of operations across multiple stages.…
Consider a system of $K$ particles moving on the vertex set of a finite connected graph with at most one particle per vertex. If there is one, the particle at $x$ chooses one of the $\hbox{deg} (x)$ neighbors of its location uniformly at…