Related papers: Error analysis and lattice improvement for the C-A…
The CLIC study of a high-energy (0.5 - 5 TeV), high-luminosity (1034 - 1035 cm-2 sec-1) e+e- linear collider is presented. Beam acceleration using high frequency (30 GHz) normal-conducting structures operating at high accelerating fields…
The Fermilab Linac delivers 400MeV, 25mA H$^-$; beam. The longitudinal bunch parameters are reconstructed using a Bunch Shape Monitor (BSM) installed in the middle of the Linac. For that, the bunch length is measured as a function of the…
The Spallation Neutron Source (SNS) is being designed for operation in 2004. The SNS is a 1 GeV machine consisting of a combination normal-conducting and super-conducting linac as well as a ring and target area. The linac front end is a…
The temperature dependence of the in-plane magnetic penetration depth, $\lambda_{ab}(T)$, has been measured in a c-axis oriented polycrystalline CaC$_{6}$ bulk sample using a high-resolution mutual inductance technique. A clear exponential…
A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for…
There is demand for the construction of a medium-energy ion linear accelerator based on superconducting rf (SRF) technology. It must be capable of producing several hundred kilowatts of CW beams ranging from protons to uranium. A…
PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting…
As a part of the ongoing XIIth plan project titled "R&D activities for high energy proton linac based spallation neutron source", the work on physics design of various subsystems of the injector linac and accumulator ring has been taken up…
Recently, the Low-Energy Demonstration Accelerator (LEDA) portion of the Accelerator Production of Tritium (APT) project reached its 100-mA, 8-hr CW beam operation milestone. LEDA consists of a 75-keV proton injector, 6.7-MeV, 350-MHz CW…
The readout electronics upgrade for the ATLAS Liquid Argon Calorimeters at the CERN Large Hadron Collider requires a radiation-hard ADC. The design of a radiation-hard dual-channel 12-bit 40 MS/s pipeline ADC for this use is presented. The…
This paper presents the design, fabrication, and characterization of broadband liquid crystal (LC) reconfigurable intelligent surfaces (RIS) operating around 60 GHz and scaling up to 750 radiating elements. The RISs employ a delay line…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and…
The Low-Energy Demonstration Accelerator (LEDA) radio-frequency quadrupole (RFQ) is a 100% duty factor (CW) linac that delivers >100 mA of H+ beam at 6.7 MeV. The 8-m-long, 350-MHz RFQ structure accelerates a dc, 75-keV, 110-mA H+ beam from…
The superconducting (SC) proton linac is proposed in the JAERI/KEK Joint Project for a high-intensity proton accelerator in the energy region from 400 to 600 MeV. Highly stable fields in the SC cavities are required under the dynamic…
Field emission can cause significant problems in superconducting radio-frequency linear accelerators (linacs). When cavity gradients are pushed higher, radiation levels within the linacs may rise exponentially, causing degradation of many…
For the CLIC two-beam scheme, a high-current, long-pulse drive beam is required for RF power generation. Taking advantage of the 3 GHz klystrons available at the LEP injector once LEP stops, a 180 MeV electron accelerator is being…
The Low Energy Relativistic Heavy Ion Collider (RHIC) electron Cooler (LEReC) is designed to deliver a 1.6 MeV to 2.6 MeV electron beam, with rms dp/p less than 5e-4. The superconducting radiofrequency (SRF) Booster Cavity is the major…
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
KEK-ATF is studying low emittance, multi-bunch electron beam for the future linear collider. The energy instability of the 1.5 GeV linac has been a problem making the beam injection to the damping ring unstable. Because the unstable beam…