Related papers: On the variable common due date, minimal tardy job…
We consider the precedence-constrained scheduling problem to minimize the total weighted completion time. For a single machine several $2$-approximation algorithms are known, which are based on linear programming and network flows. We show…
This paper focuses on the problem of coflow scheduling with precedence constraints in identical parallel networks, which is a well-known $\mathcal{NP}$-hard problem. Coflow is a relatively new network abstraction used to characterize…
This article considers the parallel machine scheduling problem with step-deteriorating jobs and sequence-dependent setup times. The objective is to minimize the total tardiness by determining the allocation and sequence of jobs on identical…
The $1 \mid \mid \Sigma w_j U_j$ problem asks to determine -- given $n$ jobs each with its own processing time, weight, and due date -- the minimum weighted number of tardy jobs in any single machine non-preemptive schedule for these jobs.…
We consider the problem of scheduling $n$ precedence-constrained jobs on $m$ uniformly-related machines in the presence of an arbitrary, fixed communication delay $\rho$. We consider a model that allows job duplication, i.e. processing of…
We study the fundamental problem of scheduling bidirectional traffic along a path composed of multiple segments. The main feature of the problem is that jobs traveling in the same direction can be scheduled in quick succession on a segment,…
We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which…
In the {\sc Min-Sum 2-Clustering} problem, we are given a graph and a parameter $k$, and the goal is to determine if there exists a 2-partition of the vertex set such that the total conflict number is at most $k$, where the conflict number…
The problem of attaining energy efficiency in distributed systems is of importance, but a general, non-domain-specific theory of energy-minimal scheduling is far from developed. In this paper, we classify the problems of energy-minimal…
Consider the many shared resource scheduling problem where jobs have to be scheduled on identical parallel machines with the goal of minimizing the makespan. However, each job needs exactly one additional shared resource in order to be…
This paper considers a combination of the joint replenishment problem with single machine scheduling. There is a single resource, which is required by all the jobs, and a job can be started at time point $t$ on the machine if and only the…
We investigate dynamic algorithms for the interval scheduling problem. Our algorithm runs in amortised time $O(\log n)$ for query operation and $O(d\log^2 n)$ for insertion and removal operations, where $n$ and $d$ are the maximal numbers…
We consider the weighted completion time minimization problem for capacitated parallel machines, which is a fundamental problem in modern cloud computing environments. We study settings in which the processed jobs may have varying duration,…
Speed-robust scheduling is the following two-stage problem of scheduling $n$ jobs on $m$ uniformly related machines. In the first stage, the algorithm receives the value of $m$ and the processing times of $n$ jobs; it has to partition the…
We study the general scheduling problem (GSP) which generalizes and unifies several well-studied preemptive single-machine scheduling problems, such as weighted flow time, weighted sum of completion time, and minimizing the total weight of…
We study the single machine scheduling problem with the objective to minimize the total weight of late jobs. It is assumed that the processing times of jobs are not exactly known at the time when a complete schedule must be dispatched.…
Two-Bar Charts Packing Problem is to pack $n$ two-bar charts (2-BCs) in a minimal number of unit-capacity bins. This problem generalizes the strongly NP-hard Bin Packing Problem. We prove that the problem remains strongly NP-hard even if…
This paper considers single-machine scheduling problems in which a given solution, i.e. an ordered set of jobs, has to be improved as much as possible by re-sequencing the jobs. The need for rescheduling may arise in different contexts,…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
In a large-scale computing cluster, the job completions can be substantially delayed due to two sources of variability, namely, variability in the job size and that in the machine service capacity. To tackle this issue, existing works have…