Related papers: On the variable common due date, minimal tardy job…
We address single machine problems with optional jobs - rejection, studied recently in Zhang et al. [21] and Cao et al. [2]. In these papers, the authors focus on minimizing regular performance measures, i.e., functions that are…
One of the classic results in scheduling theory is the 2-approximation algorithm by Lenstra, Shmoys, and Tardos for the problem of scheduling jobs to minimize makespan on unrelated machines, i.e., job j requires time p_{ij} if processed on…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
This paper considers parallel machine scheduling with incompatibilities between jobs. The jobs form a graph and no two jobs connected by an edge are allowed to be assigned to the same machine. In particular, we study the case where the…
We consider the classical problem of scheduling $n$ jobs with release dates on both single and identical parallel machines. We measure the quality of service provided to each job by its stretch, which is defined as the ratio of its response…
This paper studies scheduling coupled tasks with exact delays to minimize maximum lateness. The first task has processing time $p>0$ and the second $b_i\geq 0$, also the second needs to start exactly $p$ units of time after the completion…
We consider the online problem of minimizing weighted flow-time on unrelated machines. Although much is known about this problem in the resource-augmentation setting, these results assume that jobs can be preempted. We give the first…
Interval scheduling is a basic problem in the theory of algorithms and a classical task in combinatorial optimization. We develop a set of techniques for partitioning and grouping jobs based on their starting and ending times, that enable…
In this paper, we consider the parameterized complexity of the following scheduling problem. We must schedule a number of jobs on $m$ machines, where each job has unit length, and the graph of precedence constraints consists of a set of…
Algorithms with predictions is a recent framework that has been used to overcome pessimistic worst-case bounds in incomplete information settings. In the context of scheduling, very recent work has leveraged machine-learned predictions to…
In inland waterways, the efficient management of water lock operations impacts the level of congestion and the resulting uncertainty in inland waterway transportation. To achieve reliable and efficient traffic, schedules should be easy to…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We study a natural variant of scheduling that we call \emph{partial scheduling}: In this variant an instance of a scheduling problem along with an integer $k$ is given and one seeks an optimal schedule where not all, but only $k$ jobs, have…
This work proposes a unified heuristic algorithm for a large class of earliness-tardiness (E-T) scheduling problems. We consider single/parallel machine E-T problems that may or may not consider some additional features such as idle time,…
Rescheduling problems arise in a variety of situations where a previously planned schedule needs to be adjusted to deal with unforeseen events. A common problem is the arrival of new orders, i.e. jobs, which have to be integrated into the…
In this paper, we consider four single-machine scheduling problems with release times, with the aim of minimizing the maximum lateness. In the first problem we have a common deadline for all the jobs. The second problem looks for the Pareto…
We present a new online algorithm for profit-oriented scheduling on multiple speed-scalable processors. Moreover, we provide a tight analysis of the algorithm's competitiveness. Our results generalize and improve upon work by…
Real-time systems increasingly use multicore processors in order to satisfy thermal, power, and computational requirements. To exploit the architectural parallelism offered by the multicore processors, parallel task models, scheduling…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation…