In the scheduling with non-uniform communication delay problem, the input is a set of jobs with precedence constraints. Associated with every precedence constraint between a pair of jobs is a communication delay, the time duration the…
We consider the problem of efficiently scheduling jobs with precedence constraints on a set of identical machines in the presence of a uniform communication delay. Such precedence-constrained jobs can be modeled as a directed acyclic graph,…
We consider a classical scheduling problem on $m$ identical machines. For an arbitrary constant $q>1$, the aim is to assign jobs to machines such that $\sum_{i=1}^m C_i^q$ is minimized, where $C_i$ is the total processing time of jobs…
We consider the problem of scheduling multiprocessor jobs to minimize the total completion time under the given energy budget. Each multiprocessor job requires more than one processor at the same moment of time. Processors may operate at…
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job…
We consider the classic problem of scheduling jobs with precedence constraints on identical machines to minimize makespan, in the presence of communication delays. In this setting, denoted by $\mathsf{P} \mid \mathsf{prec}, c \mid…
Makespan minimization (on parallel identical or unrelated machines) is arguably the most natural and studied scheduling problem. A common approach in practical algorithm design is to reduce the size of a given instance by a fast…
We consider a 1-machine scheduling problem where the temperature of a job rises during processing, and cools down when not being processed according to given linear heating and cooling rates. No job's temperature is allowed to rise above a…
We study the precedence-constrained resource scheduling problem [SICOMP'75]. There are $n$ jobs where each job takes a certain time to finish and has a resource requirement throughout the execution time. There are precedence among the jobs.…
In this work, we study the computational (parameterized) complexity of $P \mid r_j, p_j=p \mid \sum_j w_j U_j$. Here, we are given $m$ identical parallel machines and $n$ jobs with equal processing time, each characterized by a release…
We investigate multi-organizational scheduling problems, building upon the framework introduced by Pascual et al.[2009]. In this setting, multiple organizations each own a set of identical machines and sequential jobs with distinct…
We consider here the MultiBot problem for the scheduling and the resource parametrization of jobs related to the production or the transportation of different products inside a given time horizon. Those jobs must meet known in advance…
The Map-Reduce computing framework rose to prominence with datasets of such size that dozens of machines on a single cluster were needed for individual jobs. As datasets approach the exabyte scale, a single job may need distributed…
Classical list scheduling is a very popular and efficient technique for scheduling jobs in parallel and distributed platforms. It is inherently centralized. However, with the increasing number of processors, the cost for managing a single…
This paper studies a scheduling problem in a parallel machine setting, where each machine must adhere to a predetermined fixed order for processing the jobs. Given $n$ jobs, each with processing times and deadlines, we aim to minimize the…
In the classical problem of scheduling on unrelated parallel machines, a set of jobs has to be assigned to a set of machines. The jobs have a processing time depending on the machine and the goal is to minimize the makespan, that is the…
Assigning jobs onto identical machines with the objective to minimize the maximal load is one of the most basic problems in combinatorial optimization. Motivated by product planing and data placement, we study a natural extension called…
In 1976, Coffman and Sethi conjectured that a natural extension of LPT list scheduling to the bicriteria scheduling problem of minimizing makespan over flowtime optimal schedules, called LD algorithm, has a simple worst-case performance…
This paper studies Makespan Minimization in the secretary model. Formally, jobs, specified by their processing times, are presented in a uniformly random order. An online algorithm has to assign each job permanently and irrevocably to one…
Speed-robust scheduling is the following two-stage problem of scheduling $n$ jobs on $m$ uniformly related machines. In the first stage, the algorithm receives the value of $m$ and the processing times of $n$ jobs; it has to partition the…