Related papers: Prior-Independent Mechanisms for Scheduling
We study the restricted case of Scheduling on Unrelated Parallel Machines. In this problem, we are given a set of jobs $J$ with processing times $p_j$ and each job may be scheduled only on some subset of machines $S_j \subseteq M$. The goal…
The Makespan Scheduling problem is an extensively studied NP-hard problem, and its simplest version looks for an allocation approach for a set of jobs with deterministic processing times to two identical machines such that the makespan is…
We consider online preemptive scheduling of jobs arriving one by one, to be assigned to two identical machines, with the goal of makespan minimization. We study the effect of selecting the best solution out of two independent solutions…
In this work we study the problem of scheduling tasks with dependencies in multiprocessor architectures where processors have different speeds. We present the preemptive algorithm "Save-Energy" that given a schedule of tasks it post…
In the online load balancing problem on related machines, we have a set of jobs (with different sizes) arriving online, and we need to assign each job to a machine immediately upon its arrival, so as to minimize the makespan, i.e., the…
Scheduling with testing is a recent online problem within the framework of explorable uncertainty motivated by environments where some preliminary action can influence the duration of a task. Jobs have an unknown processing time that can be…
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison,…
This paper presents improved approximation algorithms for the problem of multiprocessor scheduling under uncertainty, or SUU, in which the execution of each job may fail probabilistically. This problem is motivated by the increasing use of…
We investigate the scheduling of $n$ jobs divided into $c$ classes on $m$ identical parallel machines. For every class there is a setup time which is required whenever a machine switches from the processing of one class to another class.…
We study truthful mechanisms for allocation problems in graphs, both for the minimization (i.e., scheduling) and maximization (i.e., auctions) setting. The minimization problem is a special case of the well-studied unrelated machines…
We study the problem of scheduling precedence-constrained jobs on heterogenous machines in the presence of non-uniform job and machine communication delays. We are given as input $n$ unit size precedence-ordered jobs and $m$ related…
We study the classical scheduling problem on parallel machines %with precedence constraints where the precedence graph has the bounded depth $h$. Our goal is to minimize the maximum completion time. We focus on developing approximation…
We consider variants of the restricted assignment problem where a set of jobs has to be assigned to a set of machines, for each job a size and a set of eligible machines is given, and the jobs may only be assigned to eligible machines with…
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be…
In a classical scheduling problem, we are given a set of $n$ jobs of unit length along with precedence constraints and the goal is to find a schedule of these jobs on $m$ identical machines that minimizes the makespan. This problem is…
Makespan minimization on identical machines is a fundamental problem in online scheduling. The goal is to assign a sequence of jobs to $m$ identical parallel machines so as to minimize the maximum completion time of any job. Already in the…
We initiate the study of mechanism design with outliers, where the designer can discard $z$ agents from the social cost objective. This setting is particularly relevant when some agents exhibit extreme or atypical preferences. As a natural…
In this study, we investigate a scheduling problem on identical machines in which jobs require initial setup before execution. We assume that an algorithm can dynamically form a batch (i.e., a collection of jobs to be processed together)…
In this paper we consider the classic scheduling problem of minimizing total weighted completion time on unrelated machines when jobs have release times, i.e, $R | r_{ij} | \sum_j w_j C_j$ using the three-field notation. For this problem, a…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…