English
Related papers

Related papers: Coalescing at 8 GeV in the Fermilab Main Injector

200 papers

For Project X, it is planned to inject a beam of 3x10**11 particles per bunch into the Main Injector. Therefore, at 8-GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these…

Accelerator Physics · Physics 2013-01-30 D. J. Scott , D. Capista , I. Kourbanis , K. Seiya , M. -J. Yang

For Project X Fermilab Main Injector will be required to provide up to 2.3 MW to a neutrino production target at energies between 60 and 120 GeV. To accomplish the above power levels 3 times the current beam intensity will need to be…

Accelerator Physics · Physics 2012-08-17 J. Dey , I. Kourbanis

For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed.

Accelerator Physics · Physics 2012-08-17 K. Seiya , B. Chase , J. Dey , P. Joireman , I. Kourbanis , A. Yagodnitsyna

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In…

Accelerator Physics · Physics 2023-08-15 D. Neuffer , S. Belomestnykh , M. Checchin , D. Johnson , S. Posen , E. Pozdeyev , V. Pronskikh , A. Saini , N. Solyak , V. Yakovlev

The next generation of high-energy physics experiments requires high intensity protons in the multi-GeV energy range for efficient production of secondary beams. The Fermilab long-term future requires an 8 GeV proton source to feed the Main…

Accelerator Physics · Physics 2012-03-09 L. Jenner , C. Johnstone , D. Neuffer , J. Pasternak

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

Accelerator Physics · Physics 2013-01-31 K. Seiya , C. Drennan , W. A. Pellico , K. Triplett , A. Waller

Currently, Fermilab Booster accelerates ~4.5E12 protons per pulse (ppp) in 81 bunches from 400 MeV to 8 GeV at 15 Hz to provide beam to multiple HEP experiments and is being upgraded to handle higher beam intensity >6.7E12 ppp at a…

Accelerator Physics · Physics 2021-10-20 C. M. Bhat , N. Eddy

From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…

Two barrier RF systems were fabricated, tested and installed in the Fermilab Main Injector. Each can provide 8 kV rectangular pulses (the RF barriers) at 90 kHz. When a stationary barrier is combined with a moving barrier, injected beams…

Accelerator Physics · Physics 2010-01-18 W. Chou , D. Capista , J. Griffin , K-Y. Ng , D. Wildman

The Fermilab booster has an intensity upgrade plan called the Proton Improvement plan (PIP). The flux throughput goal is 2E17 protons/hour, which is almost double the current operation at 1.1E17 protons/hour. The beam loss in the machine is…

Accelerator Physics · Physics 2013-01-31 K. Seiya , J. Lackey , W. Marsh , W. Pellico , D. Still , K. Triplet , A. Waller

Fermilab has been working with the international particle physics and nuclear physics communities to explore and develop research programs possible with a new high intensity proton source known as "Project-X". Project X will provide…

High Energy Physics - Experiment · Physics 2011-09-19 R. Tschirhart

In order to meet the needs of Fermilabs planned post-collider experimental program, the total proton throughput of the 8 GeV Booster accelerator must be nearly doubled within the next two years. A system of 48 ramped corrector magnets has…

Accelerator Physics · Physics 2012-03-09 M. McAteer , S. Kopp , E. Prebys

Detrimental beam dynamics effects limit performance of high intensity rapid cycling synchrotrons (RCS) such as the 8 GeV proton Fermilab Booster. Here we report the results of comprehensive experimental studies of various beam intensity…

Accelerator Physics · Physics 2021-04-14 Jeff Eldred , Valeri Lebedev , Kiyomi Seiya , Vladimir Shiltsev

Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…

Accelerator Physics · Physics 2017-04-27 C. M. Bhat

From 2005 through 2012, the Fermilab Main Injector provided intense beams of 120 GeV protons to produce neutrino beams and antiprotons. Hardware improvements in conjunction with improved diagnostics allowed the system to reach sustained…

Accelerator Physics · Physics 2013-02-01 Bruce C. Brown

To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6…

Accelerator Physics · Physics 2007-05-23 R. Zwaska , S. Kopp , W. Pellico , R. Webber

Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…

Accelerator Physics · Physics 2015-10-29 C. M. Bhat

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…

Accelerator Physics · Physics 2018-03-06 R. Thurman-Keup , M. Alvarez , J. Fitzgerald , C. Lundberg , P. Prieto , J. Zagel , W. Blokland

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This…

The planned neutrino program at Fermilab requires large proton beam intensities in excess of 2 MW. Measuring the transverse profiles of these high intensity beams is challenging and often depends on non-invasive techniques. One such…

Accelerator Physics · Physics 2015-11-09 R. Thurman-Keup , M. Alvarez , J. Fitzgerald , C. Lundberg , P. Prieto , M. Roberts , J. Zagel , W. Blokland
‹ Prev 1 2 3 10 Next ›