A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised…
Project-X is a proposed project to be built at Fermi National Accelerator Laboratory with several potential missions. A primary part of the Project-X accelerator chain is a Superconducting linac, and In October 2009 a workshop was held to…
A 5-MeV RFQ designed for a proton current up to 100-mA CW is now under construction as part of the High Intensity Proton Injector project (IPHI). Its computed transmission is greater than 99 %. The main goals of the project are to verify…
The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long…
We explore the feasibility of a next-generation Mu2e experiment that uses Project-X beams to achieve a sensitivity approximately a factor ten better than the currently planned Mu2e facility.
The peak current limit for the Fermilab Linac was recently studied. The purpose was to learn what components of the present Linac can be used for the first stage of a proposed proton driver[1]. For this application the Linac must provide a…
The HIE-ISOLDE project represents a major upgrade of the ISOLDE nuclear facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will…
For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed.
A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration…
The 40-year-old Fermilab Proton Source machines, constituted by the Pre-Injector, Linac and the synchrotron Booster, have been the workhorse of the Fermi National Accelerator Laboratory (Fermilab). During this time, the High Energy Physics…
Fermilab's Integrable Optics Test Accelerator is an electron storage ring designed for testing advanced accelerator physics concepts, including implementation of nonlinear integrable beam optics and experiments on optical stochastic…
A capability to provide a large variety of bunch patterns is crucial for the concept of the Project X serving MW-range beam to several experiments simultaneously. This capability will be realized by the Medium Energy Beam Transport's (MEBT)…
Fermilab has submitted two Snowmass whitepapers on a future 2.4~MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between…
The Fermilab proton source is capable of providing 8 GeV protons for both the future long-baseline neutrino program (NuMI), and for a new program of low energy muon experiments. In particular, if the 8 GeV protons are rebunched and then…
Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the…
The PROMETHEUS Project is ongoing for the design and development of a 4-vane radio frequency quadrupole (RFQ) together with its H+ ion source, a low energy beam transport (LEBT) line and diagnostics section. The main goal of the project is…
Large liquid argon Time Projection Chambers have been adopted for the DUNE experiment's far detector, which will be composed of four 17 kton detectors situated 1.5 km underground at the Sanford Underground Research Facility. This represents…
The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling…
We have performed a series of experiments at Fermilab to explore the electron cloud phenomenon. The Main Injector will have its beam intensity increased four-fold in the Project X upgrade, and would be subject to instabilities from the…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector…