Related papers: The Geometry of Scheduling
We consider a recently introduced fair repetitive scheduling problem involving a set of clients, each asking for their associated job to be daily scheduled on a single machine across a finite planning horizon. The goal is to determine a job…
Weighted flow time is a fundamental and very well-studied objective function in scheduling. In this paper, we study the setting of a single machine with preemptions. The input consists of a set of jobs, characterized by their processing…
In this paper we study the classical problem of throughput maximization. In this problem we have a collection $J$ of $n$ jobs, each having a release time $r_j$, deadline $d_j$, and processing time $p_j$. They have to be scheduled…
We study approximation algorithms for scheduling problems with the objective of minimizing total weighted completion time, under identical and related machine models with job precedence constraints. We give algorithms that improve upon many…
We consider a large family of problems in which an ordering (or, more precisely, a chain of subsets) of a finite set must be chosen to minimize some weighted sum of costs. This family includes variations of Min Sum Set Cover (MSSC), several…
In this paper, we consider an NP-hard problem of scheduling a set of jobs of equal processing time on two machines, given a partial precedence order on the set of jobs, with an objective to minimize the makespan. An approximation algorithm…
We study the problem of scheduling jobs on parallel machines minimizing the total completion time, with each job using exactly one resource. First, we derive fundamental properties of the problem and show that the problem is polynomially…
We study the early work scheduling problem on identical parallel machines in order to maximize the total early work, i.e., the parts of non-preemptive jobs executed before a common due date. By preprocessing and constructing an auxiliary…
We introduce and study a general scheduling problem that we term the Packing Scheduling problem. In this problem, jobs can have different arrival times and sizes; a scheduler can process job $j$ at rate $x_j$, subject to arbitrary packing…
We consider the classic problem of scheduling jobs on unrelated machines so as to minimize the weighted sum of completion times. Recently, for a small constant $\varepsilon >0 $, Bansal et al. gave a $(3/2-\varepsilon)$-approximation…
In the classical interval scheduling type of problems, a set of $n$ jobs, characterized by their start and end time, need to be executed by a set of machines, under various constraints. In this paper we study a new variant in which the jobs…
Motivated by modern parallel computing applications, we consider the problem of scheduling parallel-task jobs with heterogeneous resource requirements in a cluster of machines. Each job consists of a set of tasks that can be processed in…
The geometric transportation problem takes as input a set of points $P$ in $d$-dimensional Euclidean space and a supply function $\mu : P \to \mathbb{R}$. The goal is to find a transportation map, a non-negative assignment $\tau : P \times…
In Polyamorous Scheduling, we are given an edge-weighted graph and must find a periodic schedule of matchings in this graph which minimizes the maximal weighted waiting time between consecutive occurrences of the same edge. This NP-hard…
Apart from the principles and methodologies inherited from Economics and Game Theory, the studies in Algorithmic Mechanism Design typically employ the worst-case analysis and approximation schemes of Theoretical Computer Science. For…
We propose a new approach to competitive analysis in online scheduling by introducing the novel concept of competitive-ratio approximation schemes. Such a scheme algorithmically constructs an online algorithm with a competitive ratio…
Routing and scheduling problems are fundamental problems in combinatorial optimization, and also have many applications. Most variations of these problems are NP-Hard, so we need to use heuristics to solve these problems on large instances,…
We study the approximability of two related machine scheduling problems. In the late work minimization problem, there are identical parallel machines and the jobs have a common due date. The objective is to minimize the late work, defined…
We consider a natural generalization of scheduling $n$ jobs on $m$ parallel machines so as to minimize the makespan. In our extension the set of jobs is partitioned into several classes and a machine requires a setup whenever it switches…
We consider the problem of finding patrol schedules for $k$ robots to visit a given set of $n$ sites in a metric space. Each robot has the same maximum speed and the goal is to minimize the weighted maximum latency of any site, where the…