Comments on "Wall-plug (AC) power consumption of a very high energy e+/e- storage ring collider" by Marc Ross
Accelerator Physics
2013-08-13 v1
Abstract
The paper arXiv:1308.0735 questions some of the technical assumptions made by the TLEP Steering Group when estimating in arXiv:1305.6498 the power requirement for the very high energy e+e- storage ring collider TLEP. We show that our assumptions are based solidly on CERN experience with LEP and the LHC, as well accelerators elsewhere, and confirm our earlier baseline estimate of the TLEP power consumption.
Keywords
Cite
@article{arxiv.1308.2629,
title = {Comments on "Wall-plug (AC) power consumption of a very high energy e+/e- storage ring collider" by Marc Ross},
author = {A. Blondel and M. Koratzinos and A. Butterworth and P. Janot and F. Zimmermann and R. Aleksan and P. Azzi and J. Ellis and M. Klute and M. Zanetti},
journal= {arXiv preprint arXiv:1308.2629},
year = {2013}
}
Comments
6 pages