Resource Leveling: Complexity of a UET two-processor scheduling variant and related problems

Computational Complexity 2024-06-13 v1 Data Structures and Algorithms

Abstract

This paper mainly focuses on a resource leveling variant of a two-processor scheduling problem. The latter problem is to schedule a set of dependent UET jobs on two identical processors with minimum makespan. It is known to be polynomial-time solvable. In the variant we consider, the resource constraint on processors is relaxed and the objective is no longer to minimize makespan. Instead, a deadline is imposed on the makespan and the objective is to minimize the total resource use exceeding a threshold resource level of two. This resource leveling criterion is known as the total overload cost. Sophisticated matching arguments allow us to provide a polynomial algorithm computing the optimal solution as a function of the makespan deadline. It extends a solving method from the literature for the two-processor scheduling problem. Moreover, the complexity of related resource leveling problems sharing the same objective is studied. These results lead to polynomial or pseudo-polynomial algorithms or NP-hardness proofs, allowing for an interesting comparison with classical machine scheduling problems.

Keywords

Cite

@article{arxiv.2406.08104,
  title  = {Resource Leveling: Complexity of a UET two-processor scheduling variant and related problems},
  author = {Pascale Bendotti and Luca Brunod Indrigo and Philippe Chrétienne and Bruno Escoffier},
  journal= {arXiv preprint arXiv:2406.08104},
  year   = {2024}
}
R2 v1 2026-06-28T17:02:57.039Z