English

Fast and Reliable Transient Simulation and Continuous Optimization of Large-Scale Gas Networks

Optimization and Control 2021-11-10 v2

Abstract

We are concerned with the simulation and optimization of large-scale gas pipeline systems in an error-controlled environment. The gas flow dynamics is locally approximated by sufficiently accurate physical models taken from a hierarchy of decreasing complexity and varying over time. Feasible work regions of compressor stations consisting of several turbo compressors are included by semiconvex approximations of aggregated characteristic fields. A discrete adjoint approach within a first-discretize-then-optimize strategy is proposed and a sequential quadratic programming with an active set strategy is applied to solve the nonlinear constrained optimization problems resulting from a validation of nominations. The method proposed here accelerates the computation of near-term forecasts of sudden changes in the gas management and allows for an economic control of intra-day gas flow schedules in large networks. Case studies for real gas pipeline systems show the remarkable performance of the new method.

Keywords

Cite

@article{arxiv.2012.02737,
  title  = {Fast and Reliable Transient Simulation and Continuous Optimization of Large-Scale Gas Networks},
  author = {Pia Domschke and Oliver Kolb and Jens Lang},
  journal= {arXiv preprint arXiv:2012.02737},
  year   = {2021}
}

Comments

26 pages, 13 figures

R2 v1 2026-06-23T20:44:22.460Z